Piping installation in the Wind Tunnel Laboratory
SAM.GOV
Due: May 27, 2025 at 05:00 PM UTC
In-Active Presolicitation Source Url

Summary

The opportunity involves the installation of upgraded piping in the Wind Tunnel Laboratory at Picatinny Arsenal, NJ, as part of a project managed by the United States Army Contracting Command on behalf of the Army Combat Capabilities Development Command. The work is intended to be awarded as a firm fixed price contract to Comairco Equipment, Inc., the original equipment manufacturer, due to their unique qualifications and expertise in handling the specific equipment involved. This project requires specialized knowledge and tooling to ensure proper installation, as the piping will connect to existing equipment that Comairco has previously supplied. Contractors with experience in similar installations and familiarity with the specific equipment and its requirements are encouraged to consider this opportunity, although it is noted that the contract is being pursued on a sole source basis.
Description
Pre-solicitation Synopsis for the piping installation in the Wind Tunnel Laboratory W15QKN-25-R-A039The United States Army Contracting Command ? New Jersey on behalf of the United States Army Combat Capabilities Development Command ? Armament Center. The Justification and Approval is attached.
Entities
DOD
Department of Defense
DOTA
Department of the Army
NAICS
238220
Set Aside
None
Place of Performance
Wind Tunnel Facility FCDD-ACM-FAATTN: TBD Picatinny Arsenal, NJ 07806-5000 07849
Point of Contact
Full Name Email Phone Type
Howard Kane [email protected] 5206697062 primary
Attachments
  • Pre-Solicitation+Synopsis+W15QKN-25-R-A051+Wind+Tunnel+Install.pdf
  • JA+Sole+Source+FAR+Part+13.5+Wind+Tunnel+Pipe+Installation+-+Final+Redacted.pdf