100% Design, B501 Mission Planning Cell
SAM.GOV
Due: June 9, 2025 at 04:00 PM UTC
In-Active Combined Synopsis/Solicitation SBA Source Url

Summary

The opportunity titled '100% Design, B501 Mission Planning Cell' involves providing comprehensive architectural and engineering services for the design and construction documentation necessary for the renovation of Building 501 at Dover Air Force Base, Delaware. The contractor will be responsible for creating detailed construction drawings, including architectural floor plans, interior design, and upgrades to electrical and HVAC systems. This project is set aside for small businesses, and contractors with expertise in architectural and engineering services, particularly those familiar with military construction standards and security requirements, are encouraged to bid. The contract is expected to be completed within 330 calendar days, with a project magnitude between $500,000 and $1,000,000.
Description

Amendment 3:

The Purpose of this Amendment is to:

1. Incorporate the Questions & Answers Document, Attachment #4.
2. Incorporate the updated SOW, dated 15 May 2025, Attachment 1.
3. Incorporate SOW Attachment 7 1G, B500 Renovation L

Entities
DOD
Department of Defense
DOTAF
Department of the Air Force
NAICS
541310
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Dover AFB , Delaware 19902
Point of Contact
Full Name Email Phone Type
Princess Rivera [email protected] 3026775223 primary
Anna George [email protected] 3026774969 secondary
Attachments
  • 1B.+SOW+Attachment+2+-+B501+Current+Floor+Plan.pdf
  • 1H.+SOW+Attachment+8+-+DAFB+AT+Awareness+for+Contractors+Trifold+Apr+24.pdf
  • 1G.+SOW+Attachment+7+-+Dover+AFB+OPSEC+Awareness+Guide+for+Contractors.pdf
  • 2.+Bid+Schedule_Bldg.+501+Mission+Planning+Cell.xlsx
  • 1D.+SOW+Attachment+4+-+B501+Generator+Authorization+Request.pdf
  • 1I.+SOW+Attachment+9+-+DAFB+AT+Awareness+Guide+for+Contractors+%28Apr+24%29.pdf
  • 1F.+SOW+Attachment+6+-+A-E+Requirements+for+Cost+Estimates.pdf
  • 1.+SOW_B501_AE+100pct+Design_3+April+2025.pdf
  • 1E.+SOW+Attachment+5+-+1391+Template.docx
  • Amendment+No.+1_FA449725R0011+0001.pdf
  • Solicitation+-+FA449725R0011.pdf
  • 3.+WD+2015-4217%2C+Rev+No.+29%2C+dated+23+Dec+2024.pdf
  • Amendment+No.+2_Solicitation+No.+FA449725R00110002.pdf
  • 1A.+SOW+Attachment+1+-+MPC+Construction+Security+Plan+%28CSP%29.pdf
  • 1C.+SOW+Attachment+3++-+B501+Initial+Concept+Renovation+Floor+Plan.pdf
  • Amendment+No.+3_Solicitation+No.+FA449725R00110003.pdf
  • 4.+Solictation+Questions+and+Answers+Document_B501.pdf
  • 1H.+SOW+Attachment+8+-+Dover+AFB+OPSEC+Awareness+Guide+for+Contractors.pdf
  • 1I.+SOW+Attachment+9+-+Dover+AFB+AT+Awareness+for+Contractors+Trifold+Apr+24.pdf
  • 1G.+SOW+Attachment+7+-+B500+Renovation+Layout.pdf
  • 1.+SOW_B501_AE+100pct+Design_15+May+2025.pdf
  • 1J.+SOW+Attachment+10+-+Dover+AFB+AT+Awareness+Guide+for+Contractors+%28Apr+24%29.pdf