Our AI platform powers the best government contractors to win more.
Be the first to know, bid, and win.
The Portsmouth Naval Shipyard (PNS) has a requirement to rent three (3) Diesel-Powered
mobile tier 4 generator with built in fuel tank. Though an automatic internal load bank to prevent
light loading is an advantage the government will accept an external load bank that is completely
Full Name | Phone | Type | |
---|---|---|---|
Christie Ashcraft | [email protected] | 2074517549 | primary |
Alyssa Cress | [email protected] | 2079940740 | secondary |