548 CTS MPU5 ANTENNA INSTALLATION AND TOWER CLIMB
SAM.GOV
Due: June 25, 2025 at 05:00 PM UTC
In-Active Combined Synopsis/Solicitation SBA Source Url

Summary

The opportunity titled '548 CTS MPU5 ANTENNA INSTALLATION AND TOWER CLIMB' is a Sources Sought notice issued by the 99th Contracting Squadron, aimed at gathering information from qualified vendors capable of performing the installation of MPU5 antennas on four permanent towers located in the Fort Johnson training area. The selected contractor will be responsible for providing all necessary labor, materials, equipment, and management to complete the installation, which must adhere to various safety and regulatory standards. This opportunity is particularly suited for contractors with experience in antenna installation, tower climbing, and compliance with federal and local regulations. Interested businesses should be prepared to demonstrate their qualifications and provide feedback on the draft statement of work included in the notice.
Description

***OFFER DUE DATE EXTENDED TO WEDNESDAY 25 JUNE 2025 AT 10:00 AM PDT***

***NO FURTHER QUESTIONS WILL BE ACCEPTED***

***UPDATED TO ADD THE FOLLOWING ATTACHMENTS:

Attachment 6 – Q&A 548 CTS MPU5 Install
Attachment 7 - SA Report – Cemetery
Attachme

Entities
DOD
Department of Defense
DOTAF
Department of the Air Force
NAICS
237130
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Fort Johnson , Louisiana
Point of Contact
Full Name Email Phone Type
Mia Webb [email protected] primary
Jeremy Rivera [email protected] secondary
Attachments
  • Sources+Sought+-+H91270522226_548+CTS+MPU5+Install.pdf
  • Attachment+2+-+Tower+As-Build+Drawings.pdf
  • Attachment+1+-+Draft+Statement+of+Work_548+CTS+MPU5+Install.pdf
  • Attachment+2+-+Statement+of+Work_548+CTS+MPU5+Install.pdf
  • Attachment+4+-+Price+List.xlsx
  • Attachment+3+-+Tower+As-Build+Drawings.pdf
  • Attachment+5+-+Wage+Determination+2015-5197.pdf
  • Attachment+1+-+Combo+Synopsis+548+CTS+MPU5+Install.pdf
  • Attachment+1+-+Combo+Synopsis+548+CTS+MPU5+Install_Revison+1.pdf
  • Attachment+10+-+SA+Report+-+Peason+West.pdf
  • Attachment+9+-+SA+Report+-+Peason+East.pdf
  • Attachment+6+-+QA+548+CTS+MPU5+Install.pdf
  • Attachment+8+-+SA+Report+-Mill+Creek.pdf
  • Attachment+2+-+Statement+of+Work_548+CTS+MPU5+Install_Revision+1.pdf
  • Attachment+1+-+Combo+Synopsis+548+CTS+MPU5+Install_Revison+2.pdf
  • Attachment+7+-+SA+Report+-+Cemetary.pdf