Addition/Repair Medical Training Facility, B3120, Eglin Air Force Base, FL
SAM.GOV
Due: July 23, 2025 at 06:00 PM UTC
In-Active Solicitation Source Url

Summary

The opportunity involves the addition and repair of the Medical Training Facility B3120 at Eglin Air Force Base, Florida. The project includes constructing a new addition that features a concrete foundation, steel frame, and a sloped metal roof, along with interior finishes and HVAC systems. The work will also involve enclosing a covered drive, reconfiguring existing rooms, and adding a 40-car parking area. This solicitation is specifically targeted at contractors who are part of the Southeast Region Multiple Award Task Order Contracts (MATOC) pool, and it is ideal for businesses with experience in design-bid-build construction projects, particularly in military or government contracting environments.
Description

****Amendment 0009 extending the due date to 23 July @ 2 PM ET.

****Amendment 0008 providing certified final plans and specs and extending the due date to 18 July @ 2 PM ET.

****Amendment 0007 extending the due date to 16 July @ 10 AM ET.

****Amendment 0006 extending the d

Entities
DOD
Department of Defense
DOTA
Department of the Army
NAICS
236220
Set Aside
None
Place of Performance
N PALM BEACH , Florida 32542
Point of Contact
Full Name Email Phone Type
CHARITY MANSFIELD [email protected] 5023156925 primary
Laura PHILLIPS-PAYNE [email protected] 5023156214 secondary
Attachments
  • W912QR-51061297_CORRFinal_FFE-0000.pdf
  • W912QR-51061297_CORRFinal_Specs_V2-0000.pdf
  • JA+Best+Cores_Redacted.pdf
  • JA+for+Interior+Color+and+Finish+Selections_Redacted.pdf
  • W912QR-51061297_CORRFinal_Specs_V3-0000.pdf
  • W912QR-51061297-0001.pdf
  • W912QR-51061297_CORRFinal_Plans-0000.pdf
  • Site+Visit+Sign+in+Sheet.pdf
  • W912QR-51061297-0002.pdf
  • W912QR-51061297-0003.pdf
  • W912QR-51061297-0003A.pdf
  • W912QR-51061297_CORRFinal_Specs-0004.pdf
  • W912QR-51061297_CORRFinal_Plans-0004.pdf
  • W912QR-51061297_CORRFinal_FFE-0004.pdf
  • W912QR-51061297_CORRFinal_Plans-0005.pdf
  • W912QR-51061297-0006.pdf
  • W912QR-51061297-0007.pdf
  • W912QR-51061297_CertFinal_Specs_Vol2-0008.pdf
  • W912QR-51061297_CertFinal_Specs_Vol3-0008.pdf
  • W912QR-51061297_CertFinal_Plans-0008.pdf
  • W912QR-51061297-0009.pdf