AJJW 25-1071M Repair Marbo BPS Tank 2, Wells 1 and 3
SAM.GOV
Due: May 30, 2025 at 04:00 AM UTC
In-Active Solicitation HZC Source Url

Summary

The opportunity titled 'AJJW 25-1071M Repair Marbo BPS Tank 2, Wells 1 and 3' involves significant repair and improvement work at the Marbo Booster Pump Station (BPS) 2, Tank 2, and Wells 1 & 3 located at Andersen Air Force Base in Guam. The project includes the installation of a dual pump system, rehabilitation of the chlorination control room, and various structural repairs to the tank and wells, including leak inspections and the installation of SCADA systems for monitoring. This solicitation is specifically set aside for small businesses under the Historically Underutilized Business Zone (HUBZone) program, making it an ideal opportunity for contractors specializing in water and sewer line construction and related services. Interested bidders should have experience in design-build projects and be capable of meeting the technical and regulatory requirements outlined in the solicitation.
Description

Repair the Marbo Booster Pump Station (BPS) 2, Tank 2, and Wells 1 & 3.

Description of Work

The Contractor shall perform BPS 2 improvements to include installation of a dual pump system, rehabilitation of the chlorination control room, and repl

Entities
DOD
Department of Defense
DOTAF
Department of the Air Force
NAICS
237110
Set Aside
HZC : Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13)
Place of Performance
Andersen AFB, Guam , Yigo , Guam 96929
Point of Contact
Full Name Email Phone Type
Francyn Salas [email protected] 6713661718 primary
Katrina Pangelinan [email protected] 6713666614 secondary
Attachments
  • Attachment+04+-+Site+Location+Map.pdf
  • Attachment+07+-+Past+Performance+Fact+Sheet.docx
  • Attachment+05+-+Attach+A+-+36+CES+Contractors+BUILDER+Inventory+Sheet+Template.xlsx
  • Attachment+13+-+Project+Requirement+Price+Schedule.pdf
  • Solicitation+Amendment+FA524025R00010002+SF+30.pdf
  • Attachment+08+-+Past+Performance+Questionnaire+%28PPQ%29_Rev+24Apr25.docx
  • Attachment+09+-+AAFB+Installation+Facilities+Standards+%28IFS%29.pdf
  • Attachment+10+-+Wage+Determination+%28GU20250001%29.pdf
  • Solicitation+Amendment+-+FA524025R00010001.pdf
  • Attachment+01+-+Statement+of+Work+%28SOW%29+dated+03+February+2025.pdf
  • Solicitation+Amendment+FA524025R00010001+SF+30.pdf
  • Attachment+12+-+PIEE+Proposal+Manager+Guide.pdf
  • Attachment+02+-+AJJW+25-1071M+35+Percent+Concept+Design+dated+12+July+2024.pdf
  • Solicitation+-+FA524025R0001.pdf
  • RFI+-+QA+FA524025R0001_29+April+2025.pdf
  • Solicitation+Amendment+-+FA524025R00010002.pdf
  • Attachment+03+-+AJJW+25-1071M+35+Percent+Design+Submittal+dated+12+July+2024.pdf
  • Attachment+06+-+Attach+B+-+AADB+Contractor+Antiterroism+Awareness.pdf
  • Attachment+11+-+Common+Construction+Prevailing+Wage+Rates+for+Guam.pdf