AJJW 25-1071M Repair Marbo BPS Tank 2, Wells 1 and 3
SAM.GOV
Due: May 30, 2025 at 04:00 AM UTC
In-Active Solicitation HZC Source Url

Summary

The opportunity titled "AJJW 25-1071M Repair Marbo BPS Tank 2, Wells 1 and 3" involves significant repair and improvement work at the Marbo Booster Pump Station (BPS) 2, Tank 2, and Wells 1 & 3 located at Andersen Air Force Base in Guam. The contractor will be responsible for installing a dual pump system, rehabilitating the chlorination control room, and replacing walls between various rooms. Additional tasks include inspecting and repairing tank walls, adding gauges and sensors for leak protection, and relocating wells. The project is a design-build contract, requiring contractors with expertise in water and sewer line construction, particularly those familiar with SCADA systems and electrical upgrades. This solicitation is set aside for small businesses under the Historically Underutilized Business Zone (HUBZone) program, making it an excellent opportunity for qualified small contractors to engage in a substantial government project.
Entities
DOD
Department of Defense
DOTAF
Department of the Air Force
NAICS
237110
Set Aside
HZC : Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13)
Place of Performance
Andersen AFB, Guam , Yigo , Guam 96929
Point of Contact
Full Name Email Phone Type
Francyn Salas [email protected] 6713661718 primary
Katrina Pangelinan [email protected] 6713666614 secondary
Attachments
  • Attachment+04+-+Site+Location+Map.pdf
  • Attachment+07+-+Past+Performance+Fact+Sheet.docx
  • Attachment+05+-+Attach+A+-+36+CES+Contractors+BUILDER+Inventory+Sheet+Template.xlsx
  • Attachment+13+-+Project+Requirement+Price+Schedule.pdf
  • Solicitation+Amendment+FA524025R00010002+SF+30.pdf
  • Attachment+08+-+Past+Performance+Questionnaire+%28PPQ%29_Rev+24Apr25.docx
  • Attachment+09+-+AAFB+Installation+Facilities+Standards+%28IFS%29.pdf
  • Attachment+10+-+Wage+Determination+%28GU20250001%29.pdf
  • RFI+-+QA+FA524025R0001_1+May+2025.pdf
  • Solicitation+Amendment+-+FA524025R00010001.pdf
  • Attachment+01+-+Statement+of+Work+%28SOW%29+dated+03+February+2025.pdf
  • Solicitation+Amendment+FA524025R00010001+SF+30.pdf
  • Attachment+12+-+PIEE+Proposal+Manager+Guide.pdf
  • Attachment+02+-+AJJW+25-1071M+35+Percent+Concept+Design+dated+12+July+2024.pdf
  • Solicitation+-+FA524025R0001.pdf
  • RFI+-+QA+FA524025R0001_29+April+2025.pdf
  • Solicitation+Amendment+-+FA524025R00010002.pdf
  • Attachment+03+-+AJJW+25-1071M+35+Percent+Design+Submittal+dated+12+July+2024.pdf
  • Attachment+06+-+Attach+B+-+AADB+Contractor+Antiterroism+Awareness.pdf
  • Attachment+11+-+Common+Construction+Prevailing+Wage+Rates+for+Guam.pdf
  • RFI+-+QA+FA524025R0001_9+May+2025.pdf
  • RFI+-+QA+FA524025R0001_14+May+2025.pdf
  • RFI+-+QA+FA524025R0001_19+May+2025.pdf
  • RFI+-+QA+FA524025R0001_23+May+2025.pdf