(Amended) Electrical Wiring Installation for Steam Generator for USDA ARS in Hilo, HI
SAM.GOV
Due: June 19, 2025 at 02:00 AM UTC
In-Active Solicitation SBA Source Url

Summary

The opportunity involves the installation of electrical wiring for a 150 kW 480-V 3-phase steam generator at the USDA Agricultural Research Service (ARS) facility in Hilo, Hawaii. Contractors will be responsible for providing all necessary labor, materials, equipment, and supervision to complete the installation in accordance with the Statement of Work (SOW) and applicable codes. This project is a total small business set-aside, making it ideal for small electrical contracting firms with experience in similar installations. The work must be completed within 90 days after the Notice to Proceed, and contractors should be prepared to adhere to Davis-Bacon wage requirements.
Description

Note: this has been amended to add a Q and A and attachment 5 As-builts. Acknowledgment of the amendment is required IAW on the SF30 with your quote submission.

Provide all labor, materials, equipment, supplies, supervision, and transportation needed for electrical wiring install

Entities
ADO
Department of Agriculture
ARS
Agricultural Research Service
NAICS
238210
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Hilo , Hawaii 96720
Point of Contact
Full Name Email Phone Type
Michael Sherlock [email protected] primary
Attachments
  • Attachment+1+Statement+of+Work+%28SOW%29.pdf
  • Attachment+2+DOL+General+Decision+HI20250001+04182025.pdf
  • SF1442+12905B25Q0061.pdf
  • Attachment+4+ARS+Form+372+Request+for+Payment.pdf
  • Attachment+3+ARS+Form+371+Construction+Progress+and+Payment+Schedule.pdf
  • 12905B25Q0061+Amendment+0001.pdf
  • Attachment+5+As-builts.pdf
  • Questions+and+Answers+for+12905B25Q0061.pdf