B040-B084 Rear Loading Dock Accessibility Upgrades
SAM.GOV
Due: June 6, 2025 at 07:00 PM UTC
In-Active Sources Sought Source Url

Summary

The B040-B084 Rear Loading Dock Accessibility Upgrades project is a Sources Sought Notice issued by the SLAC National Accelerator Laboratory, which is operated by Stanford University for the U.S. Department of Energy. This project aims to identify design-build contractors capable of addressing safety and accessibility issues at the loading dock area. The work involves infrastructure upgrades to ensure compliance with current safety and operational standards, transforming the loading dock into a safe and functional environment. Contractors with experience in design-build services, particularly those familiar with safety regulations and accessibility standards, are encouraged to express their interest in this opportunity. The formal solicitation will follow based on the responses received from this notice.
Description

DESCRIPTION

This is a Sources Sought Notice to identify design-build contractors capable of completing the planned B040-B084 Rear Loading Dock Accessibility Upgrades Project. This is not a solicitation for proposal or quotations and no award will be made from this Notice.

Entities
EDO
Department of Energy
NAICS
236220
Set Aside
None
Place of Performance
Menlo Park , California 94025
Point of Contact
Full Name Email Phone Type
Quyen Weng [email protected] None primary
Attachments
  • DRAFT_03.05_Construction_Safety_Requirements_Manual.pdf
  • DRAFT_04_Section_F_%28Deliveries_Performance%29.pdf
  • DRAFT_05.2_Design-Build_Rider_to_Fixed_Price_Construction_Aug2022.pdf
  • DRAFT_02_Section_B_%28Supplies_or_Services_and_Price_Costs%29.pdf
  • DRAFT_07.04_Work_Classification_Form_354501.pdf
  • DRAFT_07.07_Section_J_Final_Inspection_Report.pdf
  • DRAFT_03.06_Building_40_Loading_Dock_Guard_Railing_Summary_4.3.13.pdf
  • DRAFT_08.0_Section_K_%28Rep_and_Certs%29.pdf
  • DRAFT_01_RFP_Section_A_%28Subcontract_Form%29.pdf
  • DRAFT_09.2_Section_L_Attachment_B_SLAC_Question%26Answer_Log_%28RFI%29.pdf
  • DRAFT_03.03_ESH_Manual.pdf
  • DRAFT_03.2_DIVISION_01_SPECIFICATIONS.pdf
  • DRAFT_03.1_SOW_B040_B084_Accessibility_Upgrades_DB_SOW_R1.pdf
  • DRAFT_08.1_Section_K_Reps_and_Certs_Supplement.pdf
  • DRAFT_07.01_DBA_WD_CA20250018_23MAY2025_MOD07.pdf
  • DRAFT_05.0_Section_G_%28General_TsCs%29.pdf
  • DRAFT_05.1_Fixed_Price_Construction_March2024.pdf
  • DRAFT_09.1_Section_L_Attachment_A_Proposal_Breakdown_Sheet.pdf
  • DRAFT_00_Cover_Letter_354501.pdf
  • DRAFT_07.06_Section_J_SubcontractorFormSQF.pdf
  • DRAFT_07.08_Section_J_Construction_Subcontracts_Final_Release.pdf
  • DRAFT_10.0_Section_M_Evaluation_Methodology.pdf
  • DRAFT_03.04_SLAC_ESH_BIO-Project_Review_Authorization_Manual.pdf
  • DRAFT_09.0_Section_L_Instruction_to_Offerors.pdf
  • DRAFT_07.05_Section_J_SF1413.pdf
  • DRAFT_07.03_Subcontractor_Form_IIPP_052121.pdf
  • DRAFT_03.0_Section_C_%28Specifications_SOW%29.pdf
  • DRAFT_07.02_Section_J+_ISEMS.pdf
  • DRAFT_06_Section_H_%28Special_TsCs%29.pdf
  • DRAFT_03.07_Drawing_Deliverables_for_AE_Firms_and_Subcontractors.pdf