B158 Repair LRS Warehouse Offices, Add Restrooms
SAM.GOV
Due: May 29, 2025 at 09:30 PM UTC
In-Active Solicitation SBA Source Url

Summary

The opportunity titled 'B158 Repair LRS Warehouse Offices, Add Restrooms' involves a comprehensive renovation project at Columbus Air Force Base in Mississippi. The contractor will be responsible for the demolition of existing warehouse offices, construction of new warehouse offices and restrooms, renovation of the breakroom, and replacement of a roll-up door. This project requires a contractor with experience in construction, particularly in government contracting, and familiarity with the specific requirements of military installations. The work is set to be performed under a Total Small Business Set-Aside, making it accessible for small businesses that meet the necessary qualifications.
Description

AMENDMENT 1: Added attachment "Cost Breakdown"

_________________________________________________________________________

The Contractor must provide all plant, labor, equipment, transportation, and tools required to complete the renovation of the breakroom and attached o

Entities
DOD
Department of Defense
DOTAF
Department of the Air Force
NAICS
236220
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Columbus , Mississippi 39710
Point of Contact
Full Name Email Phone Type
TSgt Ranie Boukzam [email protected] 6624347772 primary
Daniel Stilts [email protected] 6624343740 secondary
Attachments
  • Solicitation+-+FA302225R0004.pdf
  • EAL+Form.pdf
  • Design+Build+SOW+Repair+LRS+Warehouse+Offices-Add+Restroom-B158.pdf
  • Wage+Determination+DBA+MS20240045.pdf
  • CAFB+Special+Construction.pdf
  • Contractors+CUI+Training+Slides.pptx
  • B158+Form+66.xlsx
  • CAFB+Electrical+Standards.pdf
  • CAFB+Mechanical+Standards.pdf
  • MFR+Contractor+CUI+Training+Acknowledgment+for+Solicitations.pdf
  • Cost+Breakdown.xlsx