B362 Fitness Center Rubber Flooring
SAM.GOV
Due: June 13, 2025 at 09:00 PM UTC
In-Active Combined Synopsis/Solicitation SBA Source Url

Summary

The B362 Fitness Center Rubber Flooring opportunity involves replacing existing rubber flooring at the Fitness Center located in Building 362 at Laughlin Air Force Base, Texas. The project requires contractors to provide all necessary materials, labor, tools, and supervision to complete the installation of approximately 7,323 square feet of rubber flooring, including wall rubber and cove base. The work must be executed within a 30-working-day timeframe following the delivery of materials, and it is crucial for bidders to demonstrate a solid understanding of the project requirements, effective installation plans, and quality control measures. This opportunity is set aside for small businesses under the NAICS code 238330, making it ideal for contractors specializing in flooring installation and renovation services.
Description

Amendment 01:

This amendment is being issued to revise the Statement of Work and attach two additional documents, as follows:

a. The SOW has been revised to correct Section 7.3 due to not taking into consideration door clearance in room 2 and 6. In Section 7.3 it is now updated to

Entities
DOD
Department of Defense
DOTAF
Department of the Air Force
NAICS
238330
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Laughlin AFB , Texas 78843
Point of Contact
Full Name Email Phone Type
Kate Renteria [email protected] 8302984629 primary
Jesus B. Valdez [email protected] 8302985175 secondary
Attachments
  • Attachment+1+B362+Fitness+Center+Rubber+Flooring+SOW.pdf
  • Attachment+7+EAL.pdf
  • Attachment+2+Building+362+Rubber+Mat+Floor+Plan.pdf
  • Attachment+6+Rubber+Flooring+Project+Pictures.pdf
  • Attachment+4+B362+Rubber+Flooring+-+Trash+Location.pdf
  • Attachment+5+Wage+Determination+15-5303.pdf
  • Attachment+3+Building+362+Rubber+Flooring+-+Staging+Area+for+Materials.pdf
  • Amendment+01-+SOW+QAs+Floor+Plan+v.2+MFR.pdf
  • Amendment+01+-+Attachment+2+B362+Fitness+Center+Rubber+Flooring+Questions+and+Answers.pdf
  • Amendment+01+-+Attachment+1+B362+Fitness+Center+Rubber+Flooring+SOW+Revision.pdf
  • Amendment+01+-+Attachment+3+Rubber+Mat+for+Fitness+Center+Version+2.pdf
  • 10+June+2025+Site+Visit+Attendence+Sheet.pdf