The Berlin Lake Sewer Treatment Plant Replacement project, managed by the U.S. Army Corps of Engineers (USACE) Pittsburgh District, involves the complete replacement of the existing Wastewater Treatment Facility (WWTF) located in Berlin Center, Pennsylvania. This project is crucial as the WWTF services USACE campgrounds and field offices, requiring continuous access and utility services throughout the construction period. Contractors with experience in water and sewer line construction, particularly those familiar with prefabricated systems and environmental compliance, are encouraged to bid. The project includes installing a new pump station, constructing a new WWTF with advanced treatment features, renovating existing facilities, and ensuring a seamless transition from the old to the new system while adhering to environmental regulations. The work is expected to commence in late 2025 and conclude by the end of 2026, with a contract value estimated between $1 million and $5 million.
Description

Berlin Lake Sewer Treatment Plant ReplacementBerlin Lake, Berlin Center, PennsylvaniaThe U.S. Army Corps of Engineers (USACE), Pittsburgh District, is carrying out a Project to replace the existing Wastewater Treatment Facility (WWTF) at the location referenced above. Work is to be performed enti

Entities
DOD
Department of Defense
DOTA
Department of the Army
NAICS
237110
Set Aside
None
Place of Performance
Berlin Lake, 7400 Bendell Road, Berlin Center, OH 44401-9707 44401
Point of Contact
Full Name Email Phone Type
Aaron M. Barr [email protected] 412-395-7157 primary
Connie L. Ferguson [email protected] (412) 395-7551 secondary
Attachments
  • Site+Visit+Attendance+7-8-2025.pdf
  • Site+Visit+Discussion+7-8-2025.pdf
  • Bid+Results.pdf
  • Bid+Opening+Attendance.pdf