Bldg 85 Conex Farm Fiber Installation
SAM.GOV
Due: July 24, 2025 at 05:00 PM UTC
In-Active Combined Synopsis/Solicitation SBA Source Url

Summary

The opportunity titled 'Bldg 85 Conex Farm Fiber Installation' is a combined synopsis/solicitation issued by the Air Force Test Center at Eglin AFB, Florida, for the installation of fiber optic and CAT6 cabling. The project involves the installation of 12 strands of single-mode fiber optic cables and 40 CAT6 cables within the Conex Farm area. This solicitation is a competitive Request for Quote (RFQ) and is set aside for small businesses, specifically under the NAICS code 237130, which pertains to power and communication line construction. Contractors with experience in telecommunications infrastructure, particularly those familiar with fiber optic installations and compliance with military standards, are encouraged to bid on this project. The award will be made to the lowest priced, responsible offeror who meets all technical requirements outlined in the Performance Work Statement (PWS).
Description

This is a combined synopsis/solicitation for commodities prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will

Entities
DOD
Department of Defense
DOTAF
Department of the Air Force
NAICS
237130
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
N PALM BEACH , Florida 32542
Point of Contact
Full Name Email Phone Type
Kristina B. Brannon [email protected] primary
Attachments
  • Att+2+96_CS+Cyber+Infrastructure+Standards+Installation+Specs_Feb+2025.pdf
  • 25Q0039-0001.pdf
  • Att+1+PWS+11+Apr+25.pdf
  • RFIs+24+Apr+25.pdf
  • Att+3+WD+15-4531+Rev+30.txt
  • Att+4+FA282325Q0039.pdf
  • 25Q0039-0002.pdf
  • Att+5+B85+Site+Visit+Meeting+Location.jpg
  • 25Q0039-0003.pdf
  • Att+2+96_CS+Cyber+Infrastructure+Standards+Installation+Specs_Jan+2024.pdf
  • SV+MFR.pdf
  • RFIs+22+May+25.pdf
  • Att+1+PWS+20+May+25.pdf
  • 25Q0039-0004.pdf
  • RFIs+17+Jul+25.pdf
  • SV2+MFR.pdf
  • RFIs+21+Jul+25.pdf
  • RFIs+22+Jul+25.pdf