Buckhorn Tailwater Stabilization - ****Amendment 0001 Issued****
SAM.GOV
Due: May 8, 2025 at 02:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The Buckhorn Tailwater Stabilization project, as outlined in Solicitation W912QR25BA012, involves significant repair work on the streambank of Squabble Creek in Buckhorn, Kentucky, which was severely eroded due to a flood event in 2022. The project requires contractors to engage in a Design/Bid/Build approach, focusing on regrading the streambank and applying rip rap stone protection to prevent further erosion. Additionally, repairs will be made to several campsites, including grading and the installation of gravel and concrete camping pads, as well as asphalt milling and overlay for the campground road. Given the environmental considerations, including the presence of endangered species, contractors with experience in civil engineering, environmental protection, and heavy construction are encouraged to bid. This opportunity is set aside for small businesses, emphasizing the need for qualified contractors who can meet the project requirements within a 60-day completion timeframe from the notice to proceed.
Description

****Amendment 0001****

Solicitation W912QR25BA012 is hereby amended as follows on 05 May 2025:

Due to the incorrect DoDAAC being selected on the line items, Amendment 0001 hereby updates the DoDAAC from 12Z688 to 964839.

*NOTE: The due date for bids has not been updated an

Entities
DOD
Department of Defense
DOTA
Department of the Army
NAICS
237990
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Point of Contact
Full Name Email Phone Type
ETHAN PHILLIPS [email protected] 502-315-6545 primary
Attachments
  • W912QR25BA012+Amendment+0001-+Buckhorn+Tailwater+Bank+Stabilization.zip
  • W912QR25BA012+Solicitation+and+Price+Breakout+Schedule+-+Buckhorn+Tailwater+Bank+Stabilization.zip
  • W912QR25BA012_Specs-0000.pdf
  • W912QR25BA012_Plans-0000.pdf
  • Site+Visit+Sign-In+Sheet.pdf