Buffalo Creek Work Center Office & Engine Storage Additions
SAM.GOV
Due: July 17, 2025 at 03:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The Buffalo Creek Work Center Office & Engine Storage Additions project involves the construction of new office space and an additional engine bay at the existing Engine Storage building located in Buffalo Creek, Colorado. This project is part of the Pike-San Isabel National Forests & Cimarron and Comanche National Grasslands and aims to improve energy efficiency and space utilization of the historical structures on site. Contractors with experience in construction, particularly those familiar with government contracts and small business set-asides, are encouraged to bid on this opportunity. The work will include mobilization, utility construction, site grading, and demolition of existing features, requiring a comprehensive understanding of construction management and quality control processes.
Description

JULY 14, 2025: POSTING OF AMENDMENT 0003 (A0003_BCWC). READ IN ITS ENTIRETY. SEE THE ATTACHMENTS/LINKS.

JUNE 24, 2025: POSTING OF AMENDMENT 0002 (A0002_BCWC). READ IN ITS ENTIRETY. SEE THE ATTACHMENTS/LINKS.


Entities
ADO
Department of Agriculture
FS
Forest Service
NAICS
236220
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Buffalo Creek , Colorado 80425
Point of Contact
Full Name Email Phone Type
Janice King\ [email protected] primary
Lucas Dahlman [email protected] secondary
Attachments
  • Attach+6+-+Drawings+4+of+7+Mech_Plumb.pdf
  • Attach+1+SOW+-+Statement+of+Work.pdf
  • Attach+10+a_Parts+1-10+Specifications+BCWC.pdf
  • Attach+5+-+Drawings+3+of+7+Structural.pdf
  • Attach+2_Schedule+of+Items.xlsx
  • Attach+10+g_Parts+44+-49+Specifications+BCWC.pdf
  • Attach+4-+Drawings+2+of+7+Civil.pdf
  • Attach+7+-+Drawings+5+of+7+Elec.pdf
  • Attach+3+-+Drawings+1+of+7+Arch.pdf
  • Attach+17+-+WD_CO20250023+dated+05.16.2025.pdf
  • Attach+10+d_Parts+23+-26+Specifications+BCWC.pdf
  • Attach+13+-+Commissioning+Plan.pdf
  • 1282B125R0021_BCWC.pdf
  • Attach+14+-+Guiding+Principles.pdf
  • Attach+10+h_Parts+50+-56+Specifications+BCWC.pdf
  • Attach+10+f_Parts+36+-43+Specifications+BCWC.pdf
  • Attach+9+-+Drawings+7+of+7+Tech.pdf
  • Attach+10+i_Parts+57-64+Specifications+BCWC.pdf
  • Attach+10+e_Parts+27+-35+Specifications+BCWC.pdf
  • Attach+10+b_Parts+11-15+Specifications+BCWC.pdf
  • Attach+15+-+Materials+Board.pdf
  • Attach+18_Buffalo+Creek+HazMat+Report+032825.pdf
  • Attach+16+-+Survey.pdf
  • Attach+11+-+Geotechnical+Report.pdf
  • Attach+10+c_Parts+16+-22+Specifications+BCWC.pdf
  • Attach+12+-+A+and+E+Report+BCWC.pdf
  • Attach+8+-+Drawings+6+of+7+Fire.pdf
  • Reduced_Attach+7b+-+Drawings+5+of+7+Elec.pdf
  • Reduced+_Attach+12+-+A+and+E+Report+BCWC.pdf
  • Reduced_Attach+7a+-+Drawings+5+of+7+Elec.pdf
  • A0001_BCWC.pdf
  • Attach+03+-+Updated+Drawings_06.24.2025.pdf
  • 2023-06-05_R2+-+CO_PKSI+-+BCWC_Water++Wastewater+Memo.pdf
  • 2024-10-10_R2+-+CO_PKSI+-+BCWC_CORE+Electric+Construction+Removal.pdf
  • 2022-12-29_R2+-+CO_PKSI+-+BCWC_MEP+Summary.pdf
  • 2024-10-10_R2+-+CO_PKSI+-+BCWC_CORE+Electric+Construction+Install.pdf
  • 2024-01-01_R2+-+CO_PKSI+-+BCWC_CORE+Electric+Builder+Developer+Service+Requirements.pdf
  • Attach+10-Specifications+Project+Manual+06.24.25.pdf
  • A0002_BCWC.pdf
  • 2022-10-12_R2+-+CO_PKSI+-+BCWC_Existing+Fence.jpg
  • A0002_SUMMARY+OF+CHANGES.pdf
  • A0003_BCWC.pdf