Buildings 1383 and 1384 Inside Plant (ISP) Replacement and Building 123 Fiber Optic Work
SAM.GOV
Due: August 7, 2025 at 07:00 PM UTC
In-Active Solicitation WOSB Source Url

Summary

The opportunity involves the replacement of Inside Plant (ISP) systems in Buildings 1383 and 1384, as well as fiber optic work in Building 123 at Luke Air Force Base, Arizona. The project includes the removal of outdated CAT-3/CAT-5 wiring, installation of new rack cabinets, and the installation of new NIPR CAT-6 cabling. Additionally, it requires the installation of approximately 2100 feet of fiber optic cable, including necessary infrastructure such as maintenance holes and a network switch. This presolicitation is specifically set aside for SBA Certified Women-Owned Small Businesses (WOSB), making it an ideal opportunity for qualified contractors in the telecommunications and construction sectors who can meet the technical and performance requirements outlined in the forthcoming solicitation.
Description

******************* Amendment 0003 Issued 28 July 2025 **********************

The purpose of Amendment 0003 is to add the following attachment:

Attachment 24 – B123 Rack Elevations

See the attached Amendment 0003 for full details.

****************************

Entities
DOD
Department of Defense
DOTAF
Department of the Air Force
NAICS
237130
Set Aside
WOSB : Women-Owned Small Business
Place of Performance
Luke Air Force Base , Arizona 85309
Point of Contact
Full Name Email Phone Type
Kelli McDonald [email protected] 6238562728 primary
Jennifer Kirsch [email protected] 6238562768 secondary
Attachments
  • Attachment+11+-+Anti-Terrorism+Pamphlet.pdf
  • Attachment+5+-+Asbestos+Recert+Ltr++B1383+Wiring+Upgrade.pdf
  • Attachment+15+-+Section+M+Evaluation+Factors+For+Award.pdf
  • Attachment+12+-+RFI+Log+-+B1383+and+B1384+ISP+Replacement+and+B123+Fiber+Optic.xlsx
  • Attachment+4+-+AETC+First+400+Feet+Standard+Guidance+with+Luke+Supplemental+May+2015+v4.pdf
  • Attachment+7+-+Asbestos+Certification+B528.pdf
  • Attachment+9+-+LUKE+MASTER+SPECS.zip
  • Attachment+2+-+SOW+Luke+AFB+B1384+ISP+Upgrade+-+8+Jan+2025.pdf
  • Attachment+10+-+WD+AZ20250039+dated+30+May+2025.pdf
  • Attachment+13+-+Past+Performance+Questionnaire.docx
  • Attachment+3+-+SOW+Luke+AFB+FOC+B123+to+B528+and+B530+-+10+April+2025.pdf
  • Attachment+14+-+Section+L+Instructions+Conditions+and+Notices+to+Offerors.pdf
  • Attachment+6+-+Asbestos+Recert+Ltr++B1384+Wiring+Upgrade.pdf
  • Solicitation+-+FA488725R0008.pdf
  • Attachment+1+-+SOW+Luke+AFB+B1383+ISP+Upgrade+-+8+Jan+2025.pdf
  • Attachment+8+-+Asbestos+Certification+B530.pdf
  • Solicitation+Amendment+FA488725R0008+0001+SF+30.pdf
  • Attachment+1+-+SOW+Luke+AFB+B1383+ISP+Upgrade+-+25July2025.pdf
  • Attachment+18+-+B1384+Comm+Cabinet+Rack+Elevation.pdf
  • Attachment+17+-+B1383+Comm+Cabinet+Rack+Elevation.pdf
  • Solicitation+Amendment+FA488725R0008+0002+SF+30.pdf
  • Attachment+19+-+Luke+AFB+BLDG+528+-+As-Built.pdf
  • Attachment+12+-+RFI+Log+-+B1383+and+B1384+ISP+Replacement+and+B123+Fiber+Optic+-+Gov+Reponse.xlsx
  • Attachment+10+-+WD+AZ20250039+dated+25+July+2025.pdf
  • Attachment+22+-+2015+MAG+Detail+Drawings.pdf
  • Attachment+23+-+2025+MAG+Specifications+for+Public+Works+Construction.pdf
  • Attachment+20+-+As-Built+bldg+1383.pdf
  • Attachment+16+-+B123+Communications+Facility+Drawings+AS-BUILD+9-29-2022.pdf
  • Attachment+2+-+SOW+Luke+AFB+B1384+ISP+Upgrade+-+25July2025.pdf
  • Attachment+21+-+As-Built+1384.pdf
  • Solicitation+Amendment+FA488725R0008+0003+SF+30.pdf
  • Attachment+24+-+B123+Rack+Elevations.pdf