Call for Solutions - Low Altitude Stalking and Striking Ordnance (LASSO) Rapid Prototyping
SAM.GOV
Due: July 3, 2025 at 04:00 PM UTC
In-Active Solicitation Source Url

Summary

The Call for Solutions - Low Altitude Stalking and Striking Ordnance (LASSO) Rapid Prototyping opportunity seeks innovative solutions to enhance the capabilities of Infantry Brigade Combat Teams (IBCT) in achieving tactical overmatch against adversary armor and hardened targets. The project focuses on the design, development, fabrication, testing, and delivery of prototype loitering munition systems that can provide immediate, long-range fire capabilities with minimal collateral damage in complex terrains. Contractors with expertise in advanced munitions, loitering systems, and military technology are encouraged to submit proposals that align with the outlined requirements, which include modularity, open architecture, and compliance with safety certifications. This initiative is critical for improving the operational effectiveness of the U.S. Army in large-scale combat operations.
Description

AMENDMENT 02 (04 JUNE 2025) - THE SOO WAS UPDATED ALONG WITH MANY ADRLs. PLEASE DOWNLOAD ALL ATTACHMENTS WITH THE TERM (Change) AT THE END FOR THE MOST RECENT VERSIONS.  THERE IS ALSO A LETTER TITLED 'AMENDMENT 2 LETTER OF EXPLANATION (FINAL) FOR YOUR REFERENCE. THANK YOU!

Entities
DOD
Department of Defense
DOTA
Department of the Army
NAICS
336411
Set Aside
None
Place of Performance
Fort Belvoir , Virginia
Point of Contact
Full Name Email Phone Type
Alyssa R, Sexton [email protected] 520-671-1517 primary
Jennifer L. Barnes [email protected] 520-671-3701 secondary
Attachments
  • LASSO+-+Call+for+Solutions.pdf
  • LASSO+-+Vendor+Response+Template+V1.0_15MAY2025.xlsx
  • LASSO+-+ADRLs_Full+Binder.pdf
  • LASSO+-+Pricing+Sheet+V1.0_15MAY2025.xlsx
  • B08+LASSO+-+Company+Response+Template+V2.0_22MAY2025+%28renamed%29.xlsx
  • B08+LASSO+-+Pricing+Sheet+V2.0_21MAY2025.xlsx
  • B08+LASSO+Call+for+Solutions+V2.1_Clean.docx
  • Q004+FIAR+%28Change%29.pdf
  • L001+PPL+%28Change%29.pdf
  • Q001+Test+Plan+%28Change%29.pdf
  • E010+Frequency+Allocation+Application+and+Certification+Support+%28Change%29.pdf
  • E003+SAR+%28Change%29.pdf
  • E008+Accident+Incident+Report+Accident+Incident+Report+Field+Incident+Report+%28Change%29.pdf
  • P003+Agenda+Brief+Meeting+Minutes+Action+Items+%28Change%29.pdf
  • E002+SDD+%28Change%29.pdf
  • L007+QRC+Operator+Manual+%28Change%29.pdf
  • E011+Unified+Data+Reference+Architecture+%28Change%29.pdf
  • E005+Source+Control+Drawings+%28Change%29.pdf
  • AMENDMENT+2+Letter+of+Explanation+%28Final%29.docx
  • E007+Engineering+and+Configuration+Control+Documentation+%28Change%29.pdf
  • L006+Training+Materials+and+IKPT+%28Change%29.pdf
  • E001+Open+Systems+Management+Plan+%28Change%29.pdf
  • E009+SEMP+%28Change%29.pdf
  • E006+CMP+%28Change%29.pdf
  • E004+Product+Drawings+Models+and+Associated+Lists+%28Change%29.pdf