SAM.GOVDue: June 6, 2025 at 02:00 PM UTCIn-ActivePresolicitationSBASource Url
Summary
The Canyon Lake Administrative Site Emergency Water Line Repair project in Fort Collins, Colorado, involves the detection and repair of a suspected failure in a potable water line. The work includes leak detection, utility locates, excavation, repair of the water line, testing, backfilling, and final surface restoration. Contractors with experience in plumbing, excavation, and utility repair, particularly those who are small businesses, are encouraged to bid on this opportunity. The project aims to ensure minimal downtime for the water supply to three work buildings at the site, requiring contractors to adhere to safety and industry standards while coordinating closely with government personnel.