Cedar Rapids Flood Risk Management Project, Reach 1, Cedar Lake South Railyard (Hoth)Floodwall
SAM.GOV
Due: May 19, 2025 at 09:30 PM UTC
In-Active Special Notice SBA Source Url

Summary

The Cedar Rapids Flood Risk Management Project, specifically for Reach 1 at the Cedar Lake South Railyard (Hoth) Floodwall, is a significant construction opportunity aimed at enhancing flood protection in Cedar Rapids, Iowa. The project encompasses a variety of tasks including site demolition, traffic control, excavation, installation of floodwalls, and restoration efforts. Contractors with expertise in civil engineering, particularly those experienced in flood risk management and large-scale construction projects, are encouraged to bid. This opportunity is set aside for small businesses, with an estimated project value ranging from $10 million to $25 million and a completion timeline of 180 consecutive calendar days for the base bid.
Description

The work includes, but is not limited to: site demolition; temporary traffic control; clearing, grubbing, and stripping; trench excavation; filling and grading; sheet pile installation; embankment, H-pile concrete floodwalls, interior drainage; roadway grade raises; water main installation; site

Entities
DOD
Department of Defense
DOTA
Department of the Army
NAICS
237990
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Cedar Rapids , Iowa 52405
Point of Contact
Full Name Email Phone Type
null null None primary
Ryan R. Larrison [email protected] secondary