Chart Recorders
SAM.GOV
Due: June 10, 2025 at 09:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The opportunity for Chart Recorders involves the procurement and installation of two new Honeywell Multitrend Plus V5 Chart Recorders at the Amistad Power Plant in Del Rio, Texas. This project is a non-personnel services contract aimed at upgrading the existing chart recording systems to enhance the monitoring of power production metrics such as MegaVars, MegaWatts, water flow rates, and generator temperatures. Contractors with expertise in electronic equipment installation, particularly those familiar with digital chart recorders and data management systems, are encouraged to bid on this solicitation. The work will require compliance with specific technical specifications and standards, ensuring that the new equipment meets or exceeds current capabilities while being integrated into the existing infrastructure.
Entities
IBAWCU
International Boundary and Water Commission: U.S.-Mexico
NAICS
334513
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Del Rio , Texas 78840
Point of Contact
Full Name Email Phone Type
Adrian Knights [email protected] 9158324794 primary
Suzette Smith [email protected] secondary
Attachments
  • PWS++Amistad+Chart+Recorders+Project.pdf
  • CLIN+Structure+-+Chart+Recorders.docx
  • wd+2015-5303.pdf