Chilled Water Modulating and Bypass Modulating Valves Project at the Anchorage Air Route Traffic Control Center (ZAN)
SAM.GOV
Due: July 1, 2025 at 09:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The Chilled Water Modulating and Bypass Modulating Valves Project at the Anchorage Air Route Traffic Control Center (ZAN) involves the replacement and servicing of valves and valve actuators at the facility located in Anchorage, Alaska. This project is a total small business set-aside, encouraging small contractors to participate in the bidding process. The work will require contractors to provide all necessary supervision, labor, equipment, tools, and materials in accordance with FAA specifications and wage determinations. Eligible contractors should have experience in mechanical systems and HVAC installations, as well as familiarity with federal contracting requirements, including compliance with the Davis-Bacon Act and the Buy American Act.
Description

Amendment 0001 is released to provide questions and answers.

The Federal Aviation Administration, Enroute Construction Branch, has a requirement to replace/service chiled water modulating and bypass modulating valves at the Anchorage ARTCC in Anchorage, Alaska.

This proje

Entities
TDO
Department of Transportation
FAA
Federal Aviation Administration
NAICS
237110
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Anchorage , Alaska
Point of Contact
Full Name Email Phone Type
Joshua Espinosa [email protected] 4043055799 primary
Attachments
  • ZAN+Boiler+Chiller+Valve+Replacement+100+mech.pdf
  • RFO+697DCK-25-R-00333.pdf
  • US+Department+of+Labor+General+Decision+AK20250001+dated+5-16-2025.pdf
  • 697DCK-25-R-00333+Amendment+00001.pdf