SAM.GOVDue: May 29, 2025 at 10:00 PM UTCIn-ActiveSolicitationSBASource Url
Summary
The CLR059 Utilidor Piping Upgrades project is a significant solicitation aimed at renewing and extending the service life of the distribution infrastructure at the Clear Space Force Station. This project involves the removal and replacement of steam, condensate, and water piping, along with necessary repairs, resealing, and insulation of the utilidor. Additionally, it includes the replacement of ladders, hatches, lighting, switches, outlets, sump pumps, and other supporting infrastructure. The estimated cost for this project ranges between $25 million and $100 million, with a performance period of approximately 1218 calendar days. Contractors with experience in large-scale utility infrastructure projects, particularly those specializing in piping systems and related construction, are encouraged to bid on this opportunity, especially small businesses as this is a total small business set-aside.
Description
This is a solicitation for a full and open Request for Proposal (RFP) to renew and extend the service life of the distribution infrastructure located within the utilidor which serves the heating and water needs for the entire Clear Space Force Station. Remove and replace the steam, condensate, and w