Construct Network Control Center
SAM.GOV
Due: August 12, 2025 at 06:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The opportunity involves the construction of a new Network Control Center at Berry Field Air National Guard Base in Nashville, Tennessee. The project requires a contractor to provide all necessary resources, including labor, materials, and supervision, to complete a building of approximately 1,500 square feet. This presolicitation is specifically set aside for small businesses, and contractors with experience in commercial and institutional building construction are encouraged to bid. The project is expected to be completed within 365 calendar days after the notice to proceed, and it includes specific requirements for energy management and air conditioning systems that must be compatible with existing installations.
Description

DATE 08/12/2025

BID OPENING POSTING

SEE ATTACHMENTS: ABSTRACT OF BIDS & BID ATTENDANCE ROSTER

END OF POST

DATE 08/05/2025

POST Q&A 43-45

THE PURPOSE OF THIS POSTING IS TO ADD QUESTIONS AND ANSWERS 43-45.

END OF POST


Entities
DOD
Department of Defense
DOTA
Department of the Army
NAICS
236220
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Nashville , Tennessee 37217
Point of Contact
Full Name Email Phone Type
Greg Allen [email protected] 6156608890 primary
Jonathan Forren [email protected] 6156608889 secondary
Attachments
  • W50S972_JA_NCC-Liebert.pdf
  • 3.+118th+Construct+NCC+B818+Specifications+06.11.25+Final+Transmission.pdf
  • W50S972_JA_NCC-Monaco.pdf
  • W50S972_JA_NCC-DDC.pdf
  • 2.+NCC+100%25+Comm+drawings+B3.pdf
  • W50S9725BA002-BKTZ222001+Construct+BNCC-B818.pdf
  • 4.+BKTZ222001+Construct+NCC++Submittals+Matrix.pdf
  • 1-+118th+Construct+NCC+B818_Drawings_B3.pdf
  • 25BA002+Attendance+Roster+07162025.pdf
  • Preproposal+minutes+W50S9725BA002.pdf
  • 25BA002+SITE+VISIT+SLIDES+20250716.pdf
  • 25BA002+BNCC+QA+1-21.pdf
  • A5-NCC+drawings+Addendum+1.pdf
  • A5.3-Led+Interior+Lighting.pdf
  • A5.1-NCC+Haul+Route+Addendum+1.pdf
  • A5.2-200kW+Diesel+Generator+Spec.pdf
  • Solicitation+Amendment+W50S9725BA0020001+SF+30.pdf
  • 25BA002+BNCC+QA+22-34.pdf
  • 25BA002+BNCC+QA+35-42.pdf
  • BNCC+Q-43.pdf
  • 118th+Bldg+818+-+A6.1.pdf
  • 25BA002+BNCC+QA+43-45.pdf
  • Abstract+of+Bids+W50S9725BA002.pdf
  • Bid+Attendance+Roster.pdf