Cross Lake Office Remodel
SAM.GOV
Due: May 20, 2025 at 08:00 PM UTC
In-Active Combined Synopsis/Solicitation SBA Source Url

Summary

The Cross Lake Office Remodel opportunity involves the installation of new closed cell spray foam insulation and a two-zone ductless mini-split air conditioning system with a heat pump, adhering to all manufacturer recommendations and local building codes. Additionally, the contractor will supply and deliver laminate flooring, ceiling tiles, and ceiling tile grids for the remodeled office space. This project is a total small business set-aside, making it an ideal opportunity for small contractors specializing in construction, HVAC installation, and interior remodeling. Interested bidders should be prepared to provide all necessary equipment, labor, and materials to complete the work as specified in the solicitation documents.
Description

THE CONTRACTOR SHALL SUPPLY ALL EQUIPMENT, LABOR, AND MATERIALS NECESSARY TO INSTALL NEW CLOSED CELL SPRAY FOAM INSULATION AND A TWO-ZONE DUCTLESS MINI-SPLIT AC WITH HEAT PUMP IN ACCORDANCE WITH ALL MANUFACTURER RECOMMENDATIONS AND LOCAL BUILDING CODES. THE CONTRACTOR SHALL ALSO SUPPLY AND DELIVE

Entities
DOD
Department of Defense
DOTA
Department of the Army
NAICS
236220
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Crosslake , Minnesota 56442
Point of Contact
Full Name Email Phone Type
Justin H. Rose [email protected] 6512905422 primary
Attachments
  • SOW+%28revised%29+Office+Remodel.docx
  • DBA+Wage+Rates.pdf
  • Solicitation+-+W912ES25QA024.pdf