Our AI platform powers the best government contractors to win more.
Be the first to know, bid, and win.
Complete repair of the west breakwater located at the Dana Point Harbor. The work consists of replacing displaced armor stone
and resetting existing stone to interlock with the new stone. Approximately 45,000 cubic yards of sediment will be dredged for
access to the breakwater. All dr
Full Name | Phone | Type | |
---|---|---|---|
Ashley Powell | [email protected] | primary | |
Patricia B Bonilla | [email protected] | secondary |