David Wayne Hooks (DWH) ATCT Replacement
SAM.GOV
Due: May 30, 2025 at 05:00 PM UTC
In-Active Combined Synopsis/Solicitation Source Url

Summary

The David Wayne Hooks (DWH) ATCT Replacement project is a significant undertaking by the Federal Aviation Administration (FAA) aimed at replacing the existing Airport Traffic Control Tower at the David Wayne Hooks Memorial Airport in Tomball, Texas. This project will follow a two-phase selection process, starting with an unrestricted Request for Qualifications (RFQ) in Phase I, where qualified contractors will be screened based on their capabilities and past performance. Successful candidates from this phase will be invited to submit proposals in Phase II, which will be a Request for Proposal (RFP). The work involves design and construction services that must comply with FAA standards and regulations, making it suitable for experienced contractors in the construction and engineering sectors, particularly those with a background in airport facilities and infrastructure projects.
Description

Updates 5/22/2025: RFI Set 1 has been uploaded to this posting. Please review the document in its entirety. The RFQ proposal due date remains unchange. 

The Federal Aviation Administration (FAA) has a requirement for the David Wayne Hooks (DWH) Airport Traffic Contro

Entities
TDO
Department of Transportation
FAA
Federal Aviation Administration
NAICS
236220
Set Aside
None
Place of Performance
Tomball , Texas
Point of Contact
Full Name Email Phone Type
Thuylinh TranNguyen [email protected] primary
Melina Nguyen [email protected] secondary
Attachments
  • J3+WD+TX20250253.pdf
  • J5+Past+Performance+Questionnaire.pdf
  • J1+DWH+Phase+I+RFQ+-+Final.pdf
  • J2+SOW_+DWH_ATCT.pdf
  • J2o+TFDS_V2.3+Terminal+ATCT.pdf
  • 697DCK-25-R-00189.pdf
  • J2j+FAA-C-1391F+-+ELD+2023.pdf
  • J2f+Requirements+Document+%28DWH+RD%29.pdf
  • J2g+FAA+BIM+Execution+Plan_v1.2+CAEG.pdf
  • J2h+FAA_Order_1053_1C+Energy-Water+Manage.pdf
  • J2k+FAA-STD-002h+Drawing+Prep+-+Sup.pdf
  • J2a+DWH+Standard+Design.pdf
  • J2m+FOTS-STD-061A.pdf
  • J2c+DWH+FINAL+Topo-Utility+Survey+%28markup%29.pdf
  • J2b+DWH+ATCT_Initial+Geotechnical+Report+April+2024.pdf
  • J2l+FAA-STD-019G+-+LPGBS+2024.pdf
  • J4+DB+Quals+-+SF330-21.pdf
  • RFQ+-+RFI+Set+1.pdf
  • J2d+DWH_AppF_OEAAA.pdf
  • J2p+Div+1+DWH+SPECS.pdf
  • J2e+DWH_V2.0_Siting_Report_Final.pdf
  • J2n+FSL+2+CI+Baseline+Requirements+Job+Aid.pdf
  • J2i+FAA-C-1217H+Chg+2+Electrical.pdf