David Wayne Hooks (DWH) ATCT Replacement
SAM.GOV
Due: May 30, 2025 at 05:00 PM UTC
In-Active Combined Synopsis/Solicitation Source Url

Summary

The David Wayne Hooks (DWH) ATCT Replacement project involves the design and construction of a new Airport Traffic Control Tower (ATCT) facility at the David Wayne Hooks Memorial Airport in Tomball, Texas. This project is part of a broader initiative by the Federal Aviation Administration (FAA) to replace existing ATCT facilities across the United States. The procurement process will follow a two-phase Best Value and Firm-Fixed-Price selection method, starting with an unrestricted Request for Qualifications (RFQ) in Phase I, where qualified contractors will be screened. Only those who successfully pass this phase will be invited to submit proposals in Phase II. Contractors with experience in design-build projects, particularly in aviation infrastructure, are encouraged to bid on this opportunity, as the project requires a comprehensive understanding of FAA standards and specifications.
Description

The Federal Aviation Administration (FAA) has a requirement for the David Wayne Hooks (DWH) Airport Traffic Control Tower (ATCT) Replacement located at Tomball, TX.

A two-phase, Best Value and Firm-Fixed-Price selection process will be utilized for this source selection in accordance with

Entities
TDO
Department of Transportation
FAA
Federal Aviation Administration
NAICS
236220
Set Aside
None
Place of Performance
Tomball , Texas
Point of Contact
Full Name Email Phone Type
Thuylinh TranNguyen [email protected] primary
Melina Nguyen [email protected] secondary
Attachments
  • J3+WD+TX20250253.pdf
  • J5+Past+Performance+Questionnaire.pdf
  • J1+DWH+Phase+I+RFQ+-+Final.pdf
  • J2+SOW_+DWH_ATCT.pdf
  • J2o+TFDS_V2.3+Terminal+ATCT.pdf
  • 697DCK-25-R-00189.pdf
  • J2j+FAA-C-1391F+-+ELD+2023.pdf
  • J2f+Requirements+Document+%28DWH+RD%29.pdf
  • J2g+FAA+BIM+Execution+Plan_v1.2+CAEG.pdf
  • J2h+FAA_Order_1053_1C+Energy-Water+Manage.pdf
  • J2k+FAA-STD-002h+Drawing+Prep+-+Sup.pdf
  • J2a+DWH+Standard+Design.pdf
  • J2m+FOTS-STD-061A.pdf
  • J2c+DWH+FINAL+Topo-Utility+Survey+%28markup%29.pdf
  • J2b+DWH+ATCT_Initial+Geotechnical+Report+April+2024.pdf
  • J2l+FAA-STD-019G+-+LPGBS+2024.pdf
  • J4+DB+Quals+-+SF330-21.pdf
  • J2d+DWH_AppF_OEAAA.pdf
  • J2p+Div+1+DWH+SPECS.pdf
  • J2e+DWH_V2.0_Siting_Report_Final.pdf
  • J2n+FSL+2+CI+Baseline+Requirements+Job+Aid.pdf
  • J2i+FAA-C-1217H+Chg+2+Electrical.pdf