David Wayne Hooks (DWH) ATCT Replacement
SAM.GOV
Due: May 30, 2025 at 05:00 PM UTC
In-Active Combined Synopsis/Solicitation Source Url

Summary

The David Wayne Hooks (DWH) ATCT Replacement project is a significant undertaking by the Federal Aviation Administration (FAA) aimed at replacing the existing Airport Traffic Control Tower at the David Wayne Hooks Memorial Airport in Tomball, Texas. This project will follow a two-phase selection process, beginning with a Request for Qualifications (RFQ) in Phase I, where contractors will be evaluated based on their qualifications. Successful candidates from this phase will be invited to submit proposals in Phase II. The work involves design and construction services that must comply with FAA standards and regulations, ensuring the new facility meets operational and functional requirements for air traffic control. Contractors with experience in design-build projects, particularly in aviation or similar infrastructure, are encouraged to bid on this opportunity, as they will need to demonstrate their capability to deliver high-quality, sustainable, and compliant facilities within a specified budget and timeline.
Description

The Federal Aviation Administration (FAA) has a requirement for the David Wayne Hooks (DWH) Airport Traffic Control Tower (ATCT) Replacement located at Tomball, TX.

A two-phase, Best Value and Firm-Fixed-Price selection process will be utilized for this source selection in accordance with

Entities
TDO
Department of Transportation
FAA
Federal Aviation Administration
NAICS
236220
Set Aside
None
Place of Performance
Tomball , Texas
Point of Contact
Full Name Email Phone Type
Thuylinh TranNguyen [email protected] primary
Melina Nguyen [email protected] secondary
Attachments
  • J3+WD+TX20250253.pdf
  • 697DCK-25-R-00189.pdf
  • J5+Past+Performance+Questionnaire.pdf
  • J1+DWH+Phase+I+RFQ+-+Final.pdf
  • J2+SOW_+DWH_ATCT.pdf
  • J2o+TFDS_V2.3+Terminal+ATCT.pdf
  • J2j+FAA-C-1391F+-+ELD+2023.pdf
  • J2f+Requirements+Document+%28DWH+RD%29.pdf
  • J2g+FAA+BIM+Execution+Plan_v1.2+CAEG.pdf
  • J2h+FAA_Order_1053_1C+Energy-Water+Manage.pdf
  • J2k+FAA-STD-002h+Drawing+Prep+-+Sup.pdf
  • J2a+DWH+Standard+Design.pdf
  • J2m+FOTS-STD-061A.pdf
  • J2c+DWH+FINAL+Topo-Utility+Survey+%28markup%29.pdf
  • J2b+DWH+ATCT_Initial+Geotechnical+Report+April+2024.pdf
  • J2l+FAA-STD-019G+-+LPGBS+2024.pdf
  • J4+DB+Quals+-+SF330-21.pdf
  • J2d+DWH_AppF_OEAAA.pdf
  • J2p+Div+1+DWH+SPECS.pdf
  • J2e+DWH_V2.0_Siting_Report_Final.pdf
  • J2n+FSL+2+CI+Baseline+Requirements+Job+Aid.pdf
  • J2i+FAA-C-1217H+Chg+2+Electrical.pdf