Deschutes National Forest - GAOA Forest Wide Trail Bridge Reconstruction
SAM.GOV
Due: July 7, 2025 at 11:00 PM UTC
In-Active Presolicitation SBA Source Url

Summary

The Deschutes National Forest is seeking contractors for the GAOA Forest Wide Trail Bridge Reconstruction project, which involves the demolition of two existing bridges and the construction of two new trail bridges. The project requires the contractor to furnish, fabricate, and treat structural timber, as well as provide all necessary materials and hardware for the construction of a 41-foot Glulam Stringer Trail Bridge and a 31-foot Longitudinal Glulam Deck Panel Trail Bridge. This opportunity is particularly suited for small businesses with experience in bridge construction and timber work, as it is a total small business set-aside. The estimated project cost is between $100,000 and $250,000, and interested contractors should be prepared to meet the specific requirements outlined in the solicitation.
Description

This project involves:

This work is taking place on the Deschutes National Forest.  The work entails the demolition of two existing Multi-Log Stringer Bridges measuring 36 feet and 25 feet in length. The scope includes furnishing, fabricating, and treating structural timber, along wi

Entities
ADO
Department of Agriculture
FS
Forest Service
NAICS
237990
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Oregon 97701
Point of Contact
Full Name Email Phone Type
Loren Mein [email protected] 2183024863 primary