SAM.GOVDue: May 6, 2025 at 11:00 PM UTCIn-ActivePresolicitationSource Url
Summary
The opportunity involves the design and construction of a Central Utility Plant (CUP) for the VA Medical Center located in Fort Harrison, Montana. This project is part of a larger initiative that includes seismic upgrades and specialty care improvements at the facility. The selected contractor will be responsible for creating a facility of approximately 15,700 Gross Square Feet, which will include a utilities distribution system, interior demolition of the existing boiler plant, and modifications to the campus's heating and chilled water systems. This presolicitation is open to both large and small businesses, and contractors with experience in design-build services, particularly in the healthcare sector, are encouraged to bid. The project will follow a Two-Phase Best Value Tradeoff RFP process, and firms will be evaluated based on technical proposals and past performance, with a construction cost estimated between $25 million and $100 million.
Description
The project is to construct a Central Utility Plant (CUP) with connections to existing facilities and associated features of work for Seismic Upgrade and Specialty Care Improvements to the Department of Veterans Affairs Medical Center (VAMC) at Fort Harrison, Montana.Within the next few weeks this o