Design and Construction of Debris Boom for Harry S. Truman Lake and Dam (Warsaw, Missouri)
SAM.GOV
Due: October 30, 2025 at 03:00 PM UTC
Active
Solicitation SBA Source Url

Summary

The opportunity involves the design and construction of a debris boom at the Harry S. Truman Dam located in Warsaw, Missouri. This project is classified as a design-build construction effort, which means that the selected contractor will be responsible for both the design and the construction phases of the project. The solicitation is a total small business set-aside, encouraging small businesses to participate in the bidding process. Contractors with experience in heavy and civil engineering construction, particularly those familiar with water management and environmental projects, are encouraged to submit proposals. The project aims to enhance flood control and environmental management at the dam, which plays a critical role in the local ecosystem and community safety.
Description

***Update: Phase 2 of the solicitation was issued on September 15, 2025 to those offerors who were selected to continue in Phase 2. Phase 2 is open only to the offerors who were selected to participate in Phase 2.

The U.S. Army Corps of Engineers, Kansas City District, ha

Entities
DOD
Department of Defense
DOTA
Department of the Army
NAICS
237990
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Point of Contact
Full Name Email Phone Type
ERICK OTTOSON [email protected] 8163893878 primary
Laura Hedrick [email protected] 8163893023 secondary
Attachments
  • Part+2+of+6+--+Attachment+1+--+Proposal+Content+and+Evaluation.pdf
  • Site+Visit+Sign-In+Sheet+-+W912DQ25R1004.pdf
  • Q+and+A+-+Solicitation+W912DQ25R1004.pdf
  • Part+3+of+6+--+Attachment+2+-+Vendor+Info+Form.pdf
  • Part+1+of+6+--+Solicitation+W912DQ25R1004+-+SF+1442+Form.pdf
  • Part+4+of+6+--+Attachment+3+-+PPQ+Form.pdf
  • Part+5+of+6+--+Attachment+4+-+Experience+Form.pdf
  • Part+6+of+6+--+Draft+Specifications.pdf
  • Amendment+0003+to+Solicitation+W912DQ25R1004.pdf
  • Amendment_0002___CLIN_Schedule.pdf
  • Amendment+0002+to+Solicitation+W912DQ25R1004.pdf
  • Amendment+0002___Attachment+5.pdf
  • Amendment+0002___Replacement_Specs_for_Phase_2.pdf
  • Amendment_0002___FOH_Clause.pdf