DESIGN BUILD CONSTRUCTION PROJECT, REPLACE WATERFRONT TRANSFORMERS AND IGLOOS AT NAVAL STATION (NS) MAYPORT, FLORIDA
SAM.GOV
Due: June 12, 2025 at 06:00 PM UTC
In-Active Special Notice Source Url

Summary

The opportunity involves a design-build construction project at Naval Station Mayport, Florida, focusing on replacing the waterfront transformers and igloos. The project aims to upgrade the primary and secondary electrical distribution system, including the installation of nine transformers with switchgears and telecommunication igloos for six substations. Additionally, it includes the demolition of an existing substation building that is vulnerable to storm surge flooding and the construction of a new elevated substation. This project is significant in scale, with an estimated construction cost between $25 million and $100 million, and is expected to take approximately 2,560 calendar days to complete. Contractors with experience in large-scale electrical infrastructure projects, particularly those familiar with Project Labor Agreements (PLAs), are encouraged to respond to this market survey as it is not a solicitation for bids but rather a request for information regarding the potential use of PLAs.
Description

This is a request for information/market survey.  This is not a request for proposal, request for quote, or an invitation for bid.  There will be no solicitation, specification, or drawings available at this time.

Naval Facilities Engineering System Command (NAVFAC) Sou

Entities
DOD
Department of Defense
DOTN
Department of the Navy
NAICS
236220
Set Aside
None
Place of Performance
Jacksonville , Florida
Point of Contact
Full Name Email Phone Type
Deborah TORRENCE [email protected] 9045426665 primary
Lindsay Betteridge [email protected] 9125734610 secondary
Attachments
  • PLA+Request+for+Information.pdf