Design Build Contract for Eagle Pass I & II Land Port of Entry (LPOE) Border Roadway Improvement and Construction (BRIC), Eagle Pass, TX
SAM.GOV
Due: April 1, 2025 at 07:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The Design Build Contract for the Eagle Pass I & II Land Port of Entry (LPOE) Border Roadway Improvement and Construction (BRIC) project in Eagle Pass, Texas, is a significant opportunity for small businesses specializing in highway, street, and bridge construction. This project, funded in part by the Inflation Reduction Act, aims to enhance the functionality of the LPOEs through roadway repairs and paving replacement, utilizing Low Embodied Carbon (LEC) materials. Contractors will be responsible for the design and construction of approximately 559,000 square feet of concrete pavement, ensuring minimal disruption to ongoing port operations during the construction phase. The project is set aside for small businesses, with a completion timeline of approximately 350 days, making it an ideal opportunity for qualified contractors looking to engage in sustainable construction practices while contributing to federal infrastructure improvements.
Description

TITLE OF PROJECT: Design-Build for Eagle Pass I & II Land Ports of Entry (LPOE), Border Roadway Improvements & Construction (BRIC) Project, Eagle Pass, Texas

The Inflation Reduction Act (IRA) of 2022, Pub. L. No. 117-169, enacted in August 2022, provided GSA

Entities
GSA
General Services Administration
PBS
Public Buildings Service
NAICS
237310
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Eagle Pass , Texas 78852
Point of Contact
Full Name Email Phone Type
Jason Gerloff [email protected] 8172018269 primary
Marsha Howard [email protected] 8179780123 secondary
Attachments
  • 0.+SF+1442+and+Price+Sheets.pdf
  • 11.+Steel-GSA+IRA+LEC+Requirements.pdf
  • 8.+Post+Award+Allocation+Form+IRA.pdf
  • 7.+Offeror+Reps+%26+Certs_May+2024.pdf
  • 2.+Past+Experience_PPQ_Factor+1.pdf
  • SF30+47PH0825R0003+Amd+0001.pdf
  • 2022.07.19+EPII+-+Final+Concepts+Report_4_Rev_Redacted_10-15-24edit.pdf
  • 6.+GSA+527_CTR+Quals+%26+Financial+Info.pdf
  • 3.+Past+Experience_PPQ_Factor+2.pdf
  • EPI+-+Final+Concepts+Report+Rev_Redacted.pdf
  • Division+01+Specs+Combined.pdf
  • 13.+Standard+Form+24+Bid+Bond.pdf
  • 12.+Asphalt-GSA+IRA+LEC+Requirements.pdf
  • Eagle+Pass+I-II+LPOE+LPOE+DB+SOW_BRIC_Updated+01072025.pdf
  • A.+Communications+Plan+Template.pdf
  • 5.+WD+%23TX20250030+Highway+1-3-25.pdf
  • 5.+WD+%23TX20250202+Building+1-3-25.pdf
  • 47PH0825R0003+Amend+0002.pdf
  • B.+FY2024+Metric+Waiver.pdf
  • Solicitation-Eagle+Pass+LPOE+BRIC.pdf
  • 9.+IRA+Proj+Submittal+Form+%26+Data+Dictionary.pdf
  • 1.+GACA+for+Google+Drive.pdf
  • Reference+Material_+P-100+v2024.pdf
  • 10.+Concrete-GSA+IRA+LEC+Requirements.pdf
  • Agreement-Eagle+Pass+LPOE+BRIC.pdf
  • 4.+Factor+4+Sustainability+Factor+Instruc.pdf