Design, Fabrication, Delivery and Installation of the Center Console at the Boston Air Traffic Control Tower
SAM.GOV
Due: May 15, 2025 at 09:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The opportunity involves the design, fabrication, delivery, and installation of a new center console at the Boston Air Traffic Control Tower (ATCT) as part of a modernization project. This project aims to replace the existing traditional turret-style consoles with a new slatwall console system that will accommodate various FAA equipment. The work includes demolition of the old consoles, installation of new electrical circuits, and ensuring that operations can continue during the installation process. Contractors with experience in custom furniture design, fabrication, and installation, particularly those familiar with FAA specifications and requirements, are encouraged to bid on this project.
Entities
TDO
Department of Transportation
FAA
Federal Aviation Administration
NAICS
337214
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Boston , Massachusetts
Point of Contact
Full Name Email Phone Type
Hector L. De Jesus [email protected] 4043055883 primary
Attachments
  • Attachment+003+-+BOS+Center+Console+Existing+Equipment+List.pdf
  • Delivery+Scheme+2+-+4th+Floor.pdf
  • Amendment+0001+-+697DCK-25-R-00210+-+Boston+ATCT+Center+Consoles+Replacement.pdf
  • Attachment+001+Statement+of+Work-BOS+ATCT+Slatwall+Center+Console+Replacement.pdf
  • Boston+Cab+Floor+4-29-2025.jpg
  • Attachment+004+-+BOS+ATCT+Cab+Drawing+-1508915-D001.pdf
  • Atttachment+002+-+Proposed+Center+Console+Layout.pdf
  • SIR+No+-+697DCK-25-R-00210+-+Boston+ATCT+Center+Consoles+Replacement.pdf
  • Delivery+Scheme+1+-+Ground+Floor.pdf
  • Amendment+0001+-+SIR+No+-+697DCK-25-R-00210+-++-+Q-A+-+Boston+ATCT+Center+Consoles+Replacement.pdf
  • Attachment+005+-+DOL+Wage+Determination+No-2015-4047-Revision+29+-+Dated-+12-23-2024.pdf