Design-Build Sitka Waterfront Improvements (Sitka, AK)
SAM.GOV
Due: May 7, 2025 at 11:00 PM UTC
In-Active Solicitation Source Url

Summary

The Design-Build Sitka Waterfront Improvements project in Sitka, Alaska, is a significant construction opportunity aimed at enhancing the U.S. Coast Guard Sitka Mooring facilities. This project involves the design and construction of a fixed Seagoing Buoy Tender (WLB) wharf and pier, which will include essential infrastructure such as shore lighting, shore tie connections, and fenders. Additionally, the scope encompasses site improvements, utility installations, and obtaining necessary permits. Contractors with experience in design-build projects, particularly those familiar with marine construction and infrastructure development, are encouraged to bid on this opportunity. The project is expected to be completed within a performance period of 1,030 calendar days after the task order award, and it may include optional items such as a boat maintenance facility and landside sitework.
Description

** The Solicitation is for NMACC III, Pool 1 existing contract holders **

This is a new Design-Build construction services requirement to design and build a fixed Seagoing Buoy Tender (WLB) wharf and pier at USCG Sitka Mooring (Sitka, AK). This effort includes, but is not limited to, desi

Entities
HSDO
Department of Homeland Security
UCG
U.S. Coast Guard
NAICS
236220
Set Aside
None
Place of Performance
Alaska 99835
Point of Contact
Full Name Email Phone Type
Tracianne Torklep [email protected] 571 607 1536 primary
Gabriel D. Perez [email protected] 571 607 1542 secondary
Attachments
  • AMENDMENT+05.pdf
  • Amend+003+%28Sitka+Waterfront+Improvement%29.pdf
  • 01c+DBA+Wage+Determ+AK20250001+%2801+30+2025%29.pdf
  • NMACC+III+Pool+1+CONTRACT+HOLDERS.pdf
  • 00+TASK+ORDER+ANNOUNCEMENT+Sitka+Waterfront.pdf
  • 01a+SPECS+Appendix+Q-Z+%28Volume+3+of+3%29.pdf
  • Amend+002+%28Sitka+Waterfront+Improvement%29.pdf
  • Shore+Tie+Cable+Standards.pdf
  • NMFS+Biological+Opinion+-+USCG+Sitka+2024.pdf
  • Electrical+Shore+Ties+CSTO+-+2025+DRAFT.pdf
  • 01a+SPECIFICATIONS+Final+%28Volume+1+of+3%29.pdf
  • 01b+FAR+Class+Dev+%2825-02%29+Waiver+of+PLA.pdf
  • 01d+Price+Proposal+FORM.pdf
  • Amend+004+%28Sitka+Waterfront+Improvement%29.pdf
  • 01a+SPECS+Appendix+A-P+%28Volume+2+of+3%29.pdf
  • Incidental+Harassment+Authorization+%28IHA%29+-+Sitka+USCG+WLB+Homeporting.pdf
  • Amend+001+%28Sitka+Waterfront+Improvement%29.pdf
  • Pre-Proposal+Site+Visit+SIGN+IN+Sheet+%2819+MAR+25%29.pdf
  • Pre-Proposal+Site+Visit+GENERAL+INFORMATION.pdf
  • Pre-Proposal+Site+Visit+REPORT+of+Attendees+%2819+MAR+25%29.pdf