Dockside (DS): USCGC CALHOUN FY25 Repair
SAM.GOV
Due: May 27, 2025 at 07:00 PM UTC
In-Active Combined Synopsis/Solicitation HZC Source Url

Summary

The opportunity titled 'Dockside (DS): USCGC CALHOUN FY25 Repair' involves comprehensive repair and maintenance work on the USCGC Calhoun, a vessel operated by the U.S. Coast Guard. The project is set to take place in North Charleston, South Carolina, and is specifically designated as a Historically Underutilized Business (HUBZone) Set-Aside, encouraging participation from small businesses located in HUBZone areas. Contractors with experience in maritime repair, particularly those familiar with the specifications and requirements of U.S. Coast Guard vessels, are encouraged to bid on this opportunity. The work includes various tasks such as inspections, maintenance, and repairs of critical systems and components of the vessel, ensuring it meets operational standards and safety regulations.
Description

Amendment 003 removes a work item.  There is no extention to the due date as a result of this amendment.

*****************************************************************

Amendment 002 adds a work item and extends proposal due date to 27 May 2025 at 3:00 pm Eastern Time.


Entities
HSDO
Department of Homeland Security
UCG
U.S. Coast Guard
NAICS
336611
Set Aside
HZC : Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13)
Place of Performance
North Charleston , South Carolina
Point of Contact
Full Name Email Phone Type
Kiku Khan [email protected] 2068150961 primary
Kiya Plummer-Dantzler [email protected] 2068203678 secondary
Attachments
  • Amendment+001+-+CGC+CALHOUN+DS.doc
  • ATTACHMENT+D_HSAM+APPENDIX+G.pdf
  • ATTACHMENT+C_REQUEST+FOR+CLARIFICATION.docx
  • ATTACHMENT+E_PAST+PERFORMANCE+QUESTIONNAIRE+%28PPQ%29.docx
  • 70Z08525RLREP0011+Calhoun+solicitation+5-8-25.pdf
  • ATTACHMENT+B_PRICING+SCEHDULE_updated.xlsx
  • ATTACHMENT+A_USCGC+CALHOUN+SPECIFICATION+FOR+DOCKSIDE+REPAIRS.pdf
  • ATTACHMENT+G_FLETC+BASE+ACCESS+AND+PIER+LAYDOWN.pdf
  • ATTACHMENT+I_NON+DISCLOSURE+AGREEMENT.pdf
  • ATTACHMENT+F_CUTTER+WORK+HOURS.pdf
  • ATTACHMENT+H_STANDARD+WMSL+SHIP+CHECK+INSTRUCTIONS.pdf
  • Amendment+002.pdf
  • Amendment+002-Specification-Revised-CALHOUN+DS-15MAY25.pdf
  • Amendment+002-Consolidated+References-CALHOUN+DS.pdf
  • Amendment+002-Price+Schedule-Revised-CALHOUN+DS-19May.xlsx
  • 70Z08525RLREP00110002_US.pdf
  • UPDATED+SPECS_FINAL_20MAY25.pdf
  • CALHOUN+WMSL+418+DS+Revised+Specifications_20MAY25.xlsx
  • 70Z08525RLREP00110001.pdf
  • 70Z08525RLREP00110003_US+%281%29.pdf