Dredge Multiple Sites Sector Long Island Sound FY26
SAM.GOV
Due: July 15, 2025 at 06:00 PM UTC
In-Active Presolicitation SBA Source Url

Summary

The Dredge Multiple Sites Sector Long Island Sound FY26 opportunity involves maintenance dredging at two U.S. Coast Guard stations: STA Jones Beach and STA Shinnecock. Contractors will be responsible for providing all necessary supervision, labor, equipment, and materials to perform dredging operations, which include the construction of a Confined Dewatering Facility (CDF) for the temporary dewatering of dredged materials. The estimated dredge volumes are approximately 10,500 cubic yards at Jones Beach and 5,800 cubic yards at Shinnecock, with the material primarily consisting of silt and sand. The work must be completed within the permitted dredge window of October 1 to December 31, and all operations must comply with federal, state, and local regulations. This opportunity is set aside for small businesses, making it ideal for contractors with experience in dredging and environmental compliance.
Description

The project includes two (2) base bid items (BBIs) as summarized below.  

Base Bid Item #1: 

Provide all supervision, labor, equipment, and materials necessary to perform maintenance dredging of the boat basin and entrance channel at U.S. Coast Guard STA Jones Beach

Entities
HSDO
Department of Homeland Security
UCG
U.S. Coast Guard
NAICS
237990
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Freeport , New York 11520
Point of Contact
Full Name Email Phone Type
Nadine Provost, Contract Specialist [email protected] 4017361766 primary
Simon W. Leung, Contracting Officer [email protected] 4017361785 secondary