Dry Dock Suction Chamber Cleaning
SAM.GOV
Due: June 6, 2025 at 05:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The opportunity for Dry Dock Suction Chamber Cleaning at the Pearl Harbor Naval Shipyard & Intermediate Maintenance Facility (PHNSY & IMF) involves the removal, testing, and proper disposal of silt and sediment from a Dry Dock Suction Chamber. This work is essential for maintaining the operational efficiency of the dry dock facilities used by the U.S. Navy. Contractors interested in bidding should be experienced in environmental services, particularly in nonhazardous waste treatment and disposal, and must be capable of providing all necessary labor, equipment, tools, and materials as outlined in the Performance Work Statement (PWS). The project is set to take place between June 30, 2025, and April 30, 2026, and is designated as a Total Small Business Set-Aside, encouraging small businesses to participate in this government contract.
Description

Pearl Harbor Naval Shipyard & Intermediate Maintenance Facility (PHNSY & IMF) is a US Navy regional industrial center that maintains, overhauls and repairs various vessels of the US Navy. Its industrial operations provide the US naval forces with a wide range of services and resources loc

Entities
DOD
Department of Defense
DOTN
Department of the Navy
NAICS
562219
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
JBPHH , Hawaii 96860
Point of Contact
Full Name Email Phone Type
Reid Saito [email protected] primary
Evangeline Calaustro [email protected] secondary
Attachments
  • Wage+Determination.pdf
  • PWS+Appendix+V+OPSEC+Contract+Requirements.pdf
  • PWS+Appendix+IV+Contractor+Security+Requirements+for+CIA.pdf
  • PWS+Appendix+III+Management+of+Weight+Handling+Equipment.pdf
  • PWS+Appendix+I+Safety+and+Health+Work+Practices+for+Contractor.pdf
  • N32253-25-Q-1001.pdf
  • PWS+Appendix+II+Environmental+Protection+Guidelines+for+Contractor.pdf