SAM.GOVDue: June 9, 2025 at 02:00 PM UTCIn-ActiveCombined Synopsis/SolicitationSource Url
Summary
The EMI Chamber B HVAC Replacement project involves the replacement of an outdated HVAC system at the U.S. Army Aberdeen Test Center's Electromagnetic Interference Facility. The contractor will be responsible for providing and installing a new 40-ton HVAC unit that utilizes a propane gas-fired heater, ensuring it is operational and integrated with existing ductwork and wiring. The project requires a comprehensive approach, including project management, equipment installation, and system integration, with a focus on maintaining specific temperature and humidity levels throughout the year. Contractors with experience in HVAC installation, particularly those familiar with propane systems and commercial HVAC controls, are encouraged to bid on this opportunity.