Our AI platform powers the best government contractors to win more.
Be the first to know, bid, and win.
The objective of this requirement for a study is to estimate the design and cost of setting up and operating a large- scale plant in the United States to produce LIB using LFP and LFMP cathode active materials. Estimates for three plant sizes should be provided for 5, 25, and 50 GWh per year capa
Full Name | Phone | Type | |
---|---|---|---|
Parker Hawk | [email protected] | 630-252-2731 | primary |
Jackie Arriaga | [email protected] | 630-252-0978 | secondary |