FA462025R0002 - Repair (Cnsld-Demo) Mission Support Group, 2245/2248/2249, Fairchild AFB, WA
SAM.GOV
Due: June 30, 2025 at 04:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The opportunity FA462025R0002 involves a design-build renovation project for the Mission Support Group buildings 2245, 2248, and 2249 at Fairchild Air Force Base in Washington. The scope of work includes a comprehensive range of tasks such as demolition, hazardous material surveys, abatement, soil testing, structural design, and various utility and landscaping works. Contractors with experience in design-build projects, particularly those familiar with military or government contracts, and those capable of handling hazardous materials will find this opportunity suitable. The project is set aside for small businesses, emphasizing the need for qualified small contractors to participate in the bidding process.
Description

This is an acquisition for a design-build renovation project for Fairchild AFB's Mission Support Group buildings 2245/2248/2249. The project is a design-­build effort and will include the following: demolition, hazardous material survey, abatement, soil testing, structural design and work

Entities
DOD
Department of Defense
DOTAF
Department of the Air Force
NAICS
236220
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Fairchild AFB , Washington 99011
Point of Contact
Full Name Email Phone Type
Samantha Gorman [email protected] 5092478136 primary
Hannah Wieber [email protected] 5092473980 secondary
Attachments
  • 25R0002_SOWAtchN-FlowTestResults.pdf
  • 25R0002_Atch8-PastPerformanceInfo.pdf
  • 25R0002_SOWAtchJ1-As-BuiltsDrawings1.pdf
  • 25R0002_SOWAtchA-SiteLocation.pdf
  • 25R0002_SOWAtchK-As-BuiltsDrawings.pdf
  • 25R0002_SOWAtchB-ConceptDrawings15APR2025.pdf
  • 25R0002_SOWAtchJ3-As-BuiltsDrawings3.pdf
  • 25R0002_Atch10-RealIDActPamphlet.pdf
  • 25R0002_SOWAtchF-HazardousMaterialsSurvey.pdf
  • 25R0002_Atch11-WA20240114-Building.pdf
  • 25R0002_Atch5-FAFBIFS.pdf
  • 25R0002_SOWAtchJ2-As-BuiltsDrawings2.pdf
  • 25R0002_Atch2-SOW20250423.pdf
  • 25R0002_Atch7-PastPerfCvrLtrQuestionnaire.pdf
  • 25R0002_SOWAtchH-UtilityMaps.pdf
  • 25R0002_Atch9-SubKTRTeamingArrngmntRelease.pdf
  • 25R0002_SOWAtchO-MechanicalCalculations.pdf
  • 25R0002_Atch1-PriceSchedule.pdf
  • 25R0002_SOWAtchI-ExistingFloorPlans.pdf
  • 25R0002_SOWAtchG-Geotech-NearbyAreas.pdf
  • 25R0002_SOWAtchM-DesignRequirements.pdf
  • 25R0002_SOWAtchE-ProgramAreasTable.pdf
  • 25R0002_SOWAtchR-BasisofDesignSolarRoadPanel.pdf
  • 25R0002_Atch3-2025BDGSpecs.pdf
  • 25R0002_SOWAtchL-As-BuiltsDrawings.pdf
  • 25R0002_SF1442-09MAY2025.pdf
  • 25R0002_SOWAtchD-RoomDataSheets.pdf
  • 25R0002_SOWAtchS-RectangularRapidFlashingBeacon.pdf
  • 25R0002_SOWAtchQ-SHPODefiningFeatures.pdf
  • 25R0002_Atch4-2025BDGDataSheets.pdf
  • 25R0002_SOWAtchC-OutlineSpecifications.pdf
  • 25R0002_SOWAtchP-StructuralCalculations.pdf
  • 25R0002_Atch6-FAFBClimateWeatherData.pdf
  • 25R0002_PreProposalSiteVisitSignIn-20250522.pdf
  • 25R0002_Amend0001-SF30-20250522.pdf
  • 25R0002_Amend0002-SF30-20250528.pdf
  • SOWAtchT_Amend0002-ElvtrRm.pdf
  • 25R0002_Atch2-Amend0002-SOW20250428.pdf
  • 25R0002_Atch2-Amend0003-SOW20250530.pdf
  • 25R0002_Amend0003-SF30-20250530.pdf
  • 25R0002_Amend0003-SOWAtchH-UtilityMaps.pdf
  • 25R0002_Amend0003-SOWAtchB-ConceptDrawings.pdf
  • 25R0002_Amend0004-SF30-20250609.pdf
  • 25R0002_Amend0005-SF30-20250617.pdf
  • 25R0002_Amend0006-SF30-20250623.pdf
  • 25R0002_Atch2-Amend0006-SOW20250623.pdf
  • 25R0002_Amend0006-SOWAtchB-ConceptDrawings.pdf