Facility Exhaust System
SAM.GOV
Due: June 2, 2025 at 07:00 PM UTC
In-Active Solicitation Source Url

Summary

The Facility Exhaust System opportunity is a Request for Proposal (RFP) issued by the Air Force Test Center (AFTC) for the design, procurement, and installation of a new exhaust system at Arnold Air Force Base in Tennessee. This project aims to enhance the capability of high-temperature materials testing by creating a vacuum system for arc heaters. Contractors with expertise in industrial machinery manufacturing, particularly those experienced in exhaust systems and vacuum technology, are encouraged to bid. The government intends to award a single, firm-fixed-price contract with a five-year ordering period, emphasizing the importance of past performance and small business participation in the evaluation process.
Description

21 April 2025 - Link to PIEE Solicitation Web Based Training: https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml

********************************************************************************

This is a Request for Proposal (RFP) for

Entities
DOD
Department of Defense
DOTAF
Department of the Air Force
NAICS
333248
Set Aside
None
Place of Performance
Arnold AFB , Tennessee 37389
Point of Contact
Full Name Email Phone Type
Haley Smith [email protected] 9314544406 primary
Bailey Deason [email protected] secondary
Attachments
  • Attachment+13+L-9+SB+Participation+Commitment+Document.pdf
  • Attachment+2+-+Technical+Requirements+Document.pdf
  • Attachment+9+L-5+Subcontractor+Consent+Letter.pdf
  • Attachment+1+-+Statement+of+Objectives.pdf
  • Attachment+14+Section+M.pdf
  • Attachment+5+L-1+PPI+Tool+Instructions.pdf
  • Attachment+10+L-6+Relevancy+Matrix.xlsx
  • Attachment+7+L-3+PPQ+Cover+Letter.pdf
  • Attachment+12+L-8+-+Requirements+Matrix.pdf
  • Attachment+11++L-7+Initial+Order+Pricing+Sheet.xlsx
  • Attachment+2c+-+SHE+and+Eng+Standards.pdf
  • Attachment+2b+-+Reference+Drawings.pdf
  • Solicitation+-+FA910125RB001.pdf
  • Attachment+2a+-+Exhaust+Boundary+Utility+Interface.pdf
  • Attachment+6+L-2+Past+and+Present+Performance+Questionnaire.pdf
  • Attachment+2d+-+Design+Submittal+Requirements.pdf
  • Attachment+4+Section+L.pdf
  • Attachment+3+-+DD1423+CDRL+Template.pdf
  • Facility+Exhaust+System+RFP+Cover+Letter.pdf