Facility Exhaust System
SAM.GOV
Due: June 30, 2025 at 07:00 PM UTC
In-Active Solicitation Source Url

Summary

The Facility Exhaust System opportunity involves the design, procurement, and installation of a system to pull exhaust vacuum for arc heaters used in high-temperature materials testing at the Arnold Engineering Development Complex, Arnold Air Force Base, TN. This project aims to enhance the testing capabilities by ensuring proper exhaust management and compliance with environmental standards. Contractors with expertise in mechanical systems, particularly those experienced in vacuum systems and environmental compliance, are encouraged to bid on this solicitation. The project requires a thorough understanding of technical requirements and the ability to meet stringent performance criteria.
Description

13 June 2025 - Amendment 2 is issued revising RFP attachments and extending the proposal due date to 30 June 2025.

*****************************************************************************

22 May 2025 - Amendment 0001 is issued extending the proposal due date for all proposal

Entities
DOD
Department of Defense
DOTAF
Department of the Air Force
NAICS
333248
Set Aside
None
Place of Performance
Arnold AFB, TN , Milligan , Tennessee 37389
Point of Contact
Full Name Email Phone Type
Haley Smith [email protected] 9314544406 primary
Attachments
  • Attachment+13+L-9+SB+Participation+Commitment+Document.pdf
  • Attachment+2+-+Technical+Requirements+Document.pdf
  • Attachment+9+L-5+Subcontractor+Consent+Letter.pdf
  • Attachment+1+-+Statement+of+Objectives.pdf
  • Attachment+14+Section+M.pdf
  • Attachment+5+L-1+PPI+Tool+Instructions.pdf
  • Attachment+10+L-6+Relevancy+Matrix.xlsx
  • Attachment+7+L-3+PPQ+Cover+Letter.pdf
  • Raw+Water+Analysis+Report+7-13-12.pdf
  • Attachment+12+L-8+-+Requirements+Matrix.pdf
  • Attachment+11++L-7+Initial+Order+Pricing+Sheet.xlsx
  • Attachment+2c+-+SHE+and+Eng+Standards.pdf
  • Attachment+2b+-+Reference+Drawings.pdf
  • Solicitation+-+FA910125RB001.pdf
  • Attachment+2a+-+Exhaust+Boundary+Utility+Interface.pdf
  • Attachment+6+L-2+Past+and+Present+Performance+Questionnaire.pdf
  • FA910125RB001+Facility+Exhaust+System+QandA+20May25.pdf
  • Attachment+2d+-+Design+Submittal+Requirements.pdf
  • Attachment+4+Section+L.pdf
  • Attachment+3+-+DD1423+CDRL+Template.pdf
  • Facility+Exhaust+System+RFP+Cover+Letter.pdf
  • Solicitation+Amendment+FA910125RB0010001+SF+30.pdf
  • Solicitation+Amendment+FA910125RB0010002+SF+30.pdf
  • Attachment+12+L-8+-+Requirements+Matrix_Amend2.pdf
  • Attachment+4+Section+L_Amend2.pdf
  • Attachment+2e+-+AEDC+Design+Review+Flow+and+Expectations.pdf
  • Attachment+2+-+Technical+Requirements+Document_Amend2.pdf
  • Attachment+14+Section+M_Amend2.pdf
  • Attachment+1+-+Statement+of+Objectives_Amend2.pdf