FCI Elkton EMG Refill Transformers
SAM.GOV
Due: May 29, 2025 at 02:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The opportunity for FCI Elkton EMG Refill Transformers involves a project to add oil to nine ground-stationed transformers at the Federal Correctional Institution in Lisbon, Ohio. The work requires a contractor to assess the current conditions of the transformers, perform necessary safety measures, and ensure that the oil levels are brought to the required specifications without causing any power disruptions to the facility. This project is suitable for small businesses with experience in electrical work, particularly those familiar with transformer maintenance and safety protocols, as it involves compliance with OSHA standards and requires a thorough understanding of electrical systems.
Entities
JDO
Department of Justice
FPS/BOP
Federal Prison System / Bureau of Prisons
NAICS
238210
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Lisbon , Ohio 44432
Point of Contact
Full Name Email Phone Type
Zach Bowers [email protected] 3304206460 primary
Logan Kress [email protected] 3304206234 secondary
Attachments
  • ELK_25Z2AE4+EMG+Refill+Transofrmers+RCA+SOW+%28Signed%29.pdf
  • BRQ+RFQP02162500015.pdf
  • Evaluation+Criteria+for+RFQP02162500015.docx