FEH Reconfiguration Phase 2 Design Services Project
SAM.GOV
Due: June 25, 2025 at 08:00 PM UTC
In-Active Sources Sought Source Url

Summary

The FEH Reconfiguration Phase 2 Design Services Project is a sources sought opportunity issued by the SLAC National Accelerator Laboratory, which is operated by Stanford University for the U.S. Department of Energy. This project aims to engage a qualified Architectural and Engineering (A/E) design firm to assist in the preparation of construction documents for two design packages related to the Far Experimental Hall (FEH). The work will involve significant modifications to the existing mechanical and electrical systems, including the design of a new PCW skid, chillers, and various laboratory spaces. Contractors with expertise in architectural and engineering design, particularly in laboratory and utility systems, are encouraged to bid on this opportunity, as they will need to adhere to SLAC standards and relevant codes throughout the design process.
Entities
EDO
Department of Energy
NAICS
541330
Set Aside
None
Place of Performance
Menlo Park , California 94025
Point of Contact
Full Name Email Phone Type
doreen agbayani [email protected] primary
Attachments
  • B2_06_Section_G_General_TsCs_DRAFT.pdf
  • B2_04-20_Attachment+K+-+LCLS+FEH+NEW+PCW+SYSTEM+-+2016_DRAFT.pdf
  • B2_04-16_Attachment+K+-+FEH+-+Hutches+4-5-6+Air+Systems+Drawings_DRAFT.pdf
  • B2_04-24_Attachment+K+-+MEZZANINE+CHILLED+WATER+TO+SERVER+RACKS+-+2011_DRAFT.pdf
  • B2_06-2_Green_On_Site_Services_Rider_%28January_2025%29_DRAFT.pdf
  • B2_04_Section_C_Cover_%28Specs_SOW%29_DRAFT.pdf
  • B2_04-11_Attachment+J+-+SLAC+Standards+and+Codes_DRAFT.pdf
  • B2_04-4_Attachment+C+-+20240328_DCS2024-002_Engineering_Study_Report_DRAFT.pdf
  • B2_04-6_Attachment+E+-+HARP-0.0-RD-0006+-+West+Laser+Hal+RDS_DRAFT.pdf
  • B2_04-1_SOW_DRAFT.pdf
  • B2_04-13_Attachment+K+-+B999+FEH+ADA+LIFT+-+2014_DRAFT.pdf
  • B2_04-23_Attachment+K+-+Mezzanine++Hutch+4+5++6+-+2012_DRAFT.pdf
  • B2_03_Section_B_%28Supplies+or+Services+and+Price_Costs%29_DRAFT.pdf
  • B2_08_Section_J_%28List+of+Attachments%29_DRAFT.pdf
  • B2_04-9_Attachment+H+-+NEH+CO2+Detector+Cooler+-+LCLSII-HE-1.6-RD-0970-R0_DRAFT.pdf
  • B2_04-7_Attachment+F+-+HARP-0.0-RD-0007+-+Wet+Lab+RDS_DRAFT.pdf
  • B2_08-3_Release_of_Claims_%28Assignment+and+Release%29_DRAFT.pdf
  • B2_05_Section_F_%28Deliveries_Performance%29_DRAFT.pdf
  • B2_04-12_Attachment+K+-+2023+Seismic+Design+Specs+-+2.21.23_DRAFT.pdf
  • B2_00_Cover_Letter_DRAFT.pdf
  • B2_04-15_Attachment+K+-+FEH+-+FCU+Full+Air+Systems+As-built+set_DRAFT.pdf
  • B2_04-5_Attachment+D+-+LCL2024-007_Electrical+Infrastructure+Report+-+20240627_DRAFT.pdf
  • B2_01-1_SLAC_Attachment_A_Clarifications_DRAFT.pdf
  • B2_04-22_Attachment+K+-+MECI+HUTCH+6+RAISED+FLOOR+-+2011_DRAFT.pdf
  • B2_04-24_Attachment+K_Mezzanine+Chilled+Water+to+Server+Racks_2011_DRAFT.pdf
  • B2_04-8_Attachment+G+-+HARP-0.0-RD-0013+-+Overflow+Room+RDS_DRAFT.pdf
  • B2_04-10_Attachment+I+-+HARP-0.0-EN-0012+-+Mech+%26+Elec+Load+Table+-+signed_DRAFT.pdf
  • B2_04-2_Attachment+A+-+Schedule_DRAFT.pdf
  • B2_08-1_Section_J_Subcontractor_Form_IIPP_052121_DRAFT.pdf
  • B2_06-1_Architect_Engineer_Subcontracts_%28Aug2023%29_DRAFT.pdf
  • B2_04-19_Attachment+K+-+Hutch+4.5+Installation+-+2015_DRAFT.pdf
  • B2_09_Section_K_%28Rep+and+Certs%29_DRAFT.pdf
  • B2_04-21_Attachment+K+-+LCLS+Record+Drawings+-+FEH++NEH+-+2008_DRAFT.pdf
  • B2_08-2_Section_J_Small_Business_Subcontracting_Plan_DRAFT.pdf
  • B2_09-1_Reps_and_Certs_Supplement_DRAFT.pdf
  • B2_02_Section_A_%28Subcontract_Form%29_DRAFT.pdf
  • B2_04-14_Attachment+K+-+FO+Single+Line+Diagram+-+4.25.24_DRAFT.pdf
  • B2_04-3_Attachment+B+-+2024-1108+SLAC+FEH+Feasibility+Study+100p_DRAFT.pdf
  • B2_07_Section_H_%28Special_TsCs%29_DRAFT.pdf
  • B2_01_SOQ_DRAFT.pdf