F--OLYM - HEART O HILLS LOOP B ABATEMENT and DEMOLITI
SAM.GOV
Due: May 16, 2025 at 12:00 AM UTC
In-Active Solicitation SBA Source Url

Summary

The opportunity titled 'F--OLYM - HEART O HILLS LOOP B ABATEMENT and DEMOLITION' involves the abatement of hazardous materials, specifically asbestos, lead, and mold, followed by the demolition of the interior rooms down to the framing of a comfort station located in Olympic National Park, Washington. The contractor will be responsible for the complete removal of these hazardous materials and their proper disposal at an authorized location outside the park. This project is a Total Small Business Set-Aside, making it an ideal opportunity for small businesses with experience in environmental remediation and demolition services. Interested contractors should be prepared to comply with federal regulations regarding hazardous materials and demonstrate their capability to manage such projects effectively.
Description
The work of this contract consists of the abatement of asbestos and demolition of the interior rooms to the interior framing. (studs). The abatement performed will be complete removal of asbestos, lead, mold, and/or other materials and / or remediation of hazardous materials. All materials removed
Entities
IDOT
Department of the Interior
NPS
National Park Service
NAICS
562910
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Point of Contact
Full Name Email Phone Type
Chisolm, Mickey [email protected] 3605653025 primary
Attachments
  • B08_Attachment_03_Map_to_HoTH_Loops_B_.pdf
  • B08_Attachment_01_Solicitation_Provisions__terms__and_Clauses_-_HOH_Abatement_and_Demolition.pdf
  • Sol_140P8325Q0016_Amd_0001.pdf
  • B08_Attachment_04_Parking_site_map_HoTH_b_loop.pdf
  • B08_Attachment_06_SCA_Wage_Determination_Clallam_County_15-5545_SAM.pdf
  • B08_Attachment_08_Exp_and_PP_Form.docx
  • B11_Site_Visit_Sign_In_Sheet_Heart_B-Loop_0001.pdf
  • Sol_140P8325Q0016.pdf
  • B08_Attachment_09_Report_on_Limitations_on_Subcontracting_Form.xlsx
  • B11_Questions___Answers_Site_Visit_Heart_B_Loop_CS_Abatement-Demo_0001.pdf
  • B08_Attachment_05_Asbestos_and_Lead_Survey_Report_-_Restroom_Loop_B_Rev__1.pdf
  • B08_Attachment_07_Forms_to_Return_with_Quote.docx
  • B08_Attachment_02_Revised_Statement_Of_Work.pdf