SAM.GOVDue: October 21, 2025 at 07:00 PM UTCIn-ActiveSolicitationSource Url
Summary
The Fort Peck Powerhouse 1 Cubicle Room 15kV Switchgear Replacement Project involves the replacement of existing 15kV class breakers and associated equipment at the Fort Peck power plant. This project requires the removal of 10 breaker cubicles and the installation of 5 new breakers along with additional outdoor rated breakers in the switchyard. The work includes extensive electrical infrastructure upgrades, such as new bus systems, control modifications, and the installation of new reactor banks. Contractors with experience in power and communication line construction, particularly those familiar with high-voltage systems and tight project timelines, should consider bidding on this opportunity.