FY 25 Wax Plant Electrical Upgrades , B3566
SAM.GOV
Due: June 12, 2025 at 09:00 PM UTC
In-Active Presolicitation SBA Source Url

Summary

The FY 25 Wax Plant Electrical Upgrades project, designated as B3566, is a presolicitation opportunity issued by the U.S. Army Corps of Engineers. This design-build construction project aims to enhance the electrical systems at Building 3566, located at Yuma Proving Grounds, Arizona. The scope of work includes completing design-build drawings from 65% to 100% and installing three Wax Mixing, Melting, and Pouring Systems (WMMPS) along with two conditioning chambers. The new systems will replace existing steam injection methods with electric resistive heating, necessitating the removal of outdated equipment and the upgrade of electrical service to meet increased demands. Contractors with expertise in electrical upgrades, design-build projects, and experience in government contracting, particularly small businesses, are encouraged to bid on this opportunity.
Description

This posting will be re-issued on SAM at a later date via PIEE

Design Build construction project to complete D-B drawings from 65% to 100% and furnish all materials and labor necessary to install three (3) Wax Mixing, Melting, and Pouring Systems (WMMPS) and two (2) conditioning chambers

Entities
DOD
Department of Defense
DOTA
Department of the Army
NAICS
238990
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Yuma Proving Ground , Arizona 85365
Point of Contact
Full Name Email Phone Type
Otse.A.Adikhai [email protected] 2134523248 primary
Christina M. Chavez [email protected] 2134523246 secondary