SAM.GOVDue: June 17, 2025 at 09:00 PM UTCIn-ActivePresolicitationSBASource Url
Summary
The FY 25 Wax Plant Electrical Upgrades project at Yuma Proving Ground involves a design-build construction effort to enhance the electrical systems within Building 3566. The scope includes completing design drawings from 65% to 100% and installing three Wax Mixing, Melting, and Pouring Systems (WMMPS) along with two conditioning chambers. This upgrade aims to replace existing steam injection systems with electric resistive heating, thereby improving efficiency in the wax loading process for projectile and mortar bodies. Contractors with expertise in electrical upgrades, design-build projects, and experience in military or industrial settings are encouraged to bid, particularly those classified as small businesses under the SBA guidelines.
Description
Design Build construction project to complete D-B drawings from 65% to 100% and furnish all materials and labor necessary to install three (3) Wax Mixing, Melting, and Pouring Systems (WMMPS) and two (2) conditioning chambers at Building 3566, Yuma Proving Grounds (YPG). The WMMPS and chambers will
Entities
DOD
Department of Defense
DOTA
Department of the Army
NAICS
238990
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Yuma Proving Ground301 C St. Building 3566Yuma, AZ 85365 , Yuma Proving Ground , Arizona 85365