The FY25 Baltimore Harbor and Channels Maintenance Dredging project involves the maintenance dredging of approximately 2,044,000 cubic yards from the Cape Henry Federal Navigation Channel, which serves the Port of Baltimore. This presolicitation opportunity is aimed at contractors with expertise in dredging operations, particularly those capable of utilizing large hopper dredges to remove material from deep-draft federal navigation channels. The work is scheduled to take place between November 2025 and March 2026, with a total estimated construction cost ranging from $20 million to $25 million. Contractors interested in this opportunity should be prepared to transport the dredged material to the designated Government-furnished placement area at the Dam Neck Ocean Disposal Site, adhering to the required depth specifications and project timelines.
Description
The project consists of maintenance dredging approximately 2,044,000 cubic yards (cy) from the deep-draft federal navigation channel serving the Port of Baltimore. The work is to be performed between November 2025 through March 2026. The project consists of dredging portions of the Cape Henry Federa